当前位置: 主页 > 航空资料 >

A320飞机维护手册 AMM 指示/记录系统 5

日期: 2011-03-25 12:19:27

+---------------------------------------------------------------------+ | Value | Content Description | |--------------|------------------------------------------------------| R |--------------|---------------------------------------------...

A320飞机维护手册 AMM 指示/记录系统 4

日期: 2011-03-25 12:16:53

3. Job Set-up __________ Subtask 31-36-00-860-061 A. Aircraft Maintenance Configuration (1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002) (2) Energize the CFDS. R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 31-36-...

A320飞机维护手册 AMM 指示/记录系统 3

日期: 2011-03-25 12:14:46

(4) Remove the QAR (1) from its rack (3). (5) Put blanking caps on the disconnected electrical connectors (2). R 1EFF : 001-049, 051-099, 101-105, 1 31-33-52Page 402 1 1 May 01/05 1 1 1CES 1 Quick Access Recorder (QAR) Figure 401/TASK 31-3...

A320飞机维护手册 AMM 指示/记录系统 2

日期: 2011-03-25 12:12:39

(e) Structure of the BITE system pages (example with TROUBLE SHOOTING DATA of SDAC 1) ------------------------------------------------------------------| Character | Content | ---------------------------------------------------------------...

A320飞机维护手册 AMM 指示/记录系统INDICATING/RECORDING SYSTE

日期: 2011-03-25 12:08:48

HIGHLIGHTS __________ REVISION NO. 30 Aug 01/05 Pages which have been revised are outlined below, together with the Highlights of the Revision CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES CHAPTER 31 L.E.P. 1-34 REVISED TO REFLECT THIS RE...

A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2

日期: 2011-03-24 08:57:45

-------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-41-00-861-002 Energize the Aircraft Electrical Circuits...

A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨1

日期: 2011-03-24 08:55:33

HIGHLIGHTS __________ REVISION NO. 30 Aug 01/05 Pages which have been revised are outlined below, together with the Highlights of the Revision CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES CHAPTER 30 L.E.P. 1- 7 REVISED TO REFLECT THIS RE...

A320飞机维护手册 AMM HYDRAULIC POWER 液压6

日期: 2011-03-24 08:43:41

BLUE AUXILIARY HYDRAULIC POWER (RAM AIR TURBINE) - REPAIRS __________________________________________________________ R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499, TASK 29-22-00-300-001 Repair of the Blades of the Ram Ai...

A320飞机维护手册 AMM HYDRAULIC POWER 液压5

日期: 2011-03-24 08:41:32

5. Close-up ________ Subtask 29-14-00-860-051 A. Put the aircraft back to the serviceable condition. (1) Close the ground connector and disconnect the ground air supply. (2) Install the blanking cap on the ground connector. (3) Remove the...

A320飞机维护手册 AMM HYDRAULIC POWER 液压4

日期: 2011-03-24 08:39:35

B. Installation of the PTU Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN _______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO...

A320飞机维护手册 AMM HYDRAULIC POWER 液压3

日期: 2011-03-24 08:37:35

Subtask 29-11-52-865-050 C. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION ---------------------------------------------...

A320飞机维护手册 AMM HYDRAULIC POWER 液压2

日期: 2011-03-24 08:35:12

Subtask 29-10-00-210-060 B. Do a Check of the Filters in the Green Hydraulic System (1) For the low pressure (return) filter (1002GM): (a) Make sure that the red indicator button is not out. If the red indicator button is out, do these ste...

A320飞机维护手册 AMM HYDRAULIC POWER 液压1

日期: 2011-03-24 08:31:30

HIGHLIGHTS __________ REVISION NO. 30 Aug 01/05 Pages which have been revised are outlined below, together with the Highlights of the Revision CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES CHAPTER 29 L.E.P. 1-20 REVISED TO REFLECT THIS RE...

A320飞机维护手册 AMM FUEL 燃油6

日期: 2011-03-22 07:05:47

- install 540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 540HB, 540JB, 574BB FOR 14QT2 - install 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB, 640HB, 640JB, 674BB. (3) Remove the HOOK-COVER (RIB 2 SURGE DOORS) and carefully close the...

A320飞机维护手册 AMM FUEL 燃油5

日期: 2011-03-22 07:03:53

R 1EFF : 301-399, 1 28-42-00Page 54 1 1 May 01/04 1 1 1CES 1 R ------------------------------------------------------------------------------- R | PARAMETER LIST PARAMETER CHARACTERISTICS (NUMERIC) | R -------------------------------------...

A320飞机维护手册 AMM FUEL 燃油4

日期: 2011-03-22 06:55:48

B. Aircraft Maintenance Configuration (1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). (2) Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001). 4. Procedure _________ R **ON A/C 001-049, 051-099,...

A320飞机维护手册 AMM FUEL 燃油3

日期: 2011-03-22 06:52:35

-------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- -release (out) the X FEED - the X FEED P/BSW ON and OPEN lights P/...

A320飞机维护手册 AMM FUEL 燃油2

日期: 2011-03-22 06:49:13

15. R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, 5. Close-up ________ Subtask 28-12-41-410-055 A. Close Access (1) Make sure that the work area is clean and clear of tool(s) and other items. (2) Install the applicable a...

A320飞机维护手册 AMM FUEL 燃油1

日期: 2011-03-22 06:45:17

HIGHLIGHTS __________ REVISION NO. 30 Aug 01/05 Pages which have been revised are outlined below, together with the Highlights of the Revision CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES CHAPTER 28 L.E.P. 1-23 REVISED TO REFLECT THIS RE...

A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵9

日期: 2011-03-22 06:40:26

the RAT extension command is generated - the AC and DC essential busbars are immediately supplied by the batteries. -after 7s the AC and DC essential busbars are supplied by the standby generator. The RAT extension can be manually controll...