• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2011-08-28 14:12来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

X. AREA OF OPERATION: POST-FLIGHT PROCEDURES
TASK: AFTER LANDING AND SECURING
REFERENCES: AC 61-13; Helicopter Flight Manual.
Objective. To determine that the applicant:
1.  
Exhibits knowledge of the elements related to after-landing procedures, including local and ATC operations, ramp safety, parking hand signals, shutdown, securing, and post-flight inspection.

2.  
Minimizes the hazardous effects of rotor downwash during hovering.

3.  
Selects a suitable parking area while considering wind and the safety of nearby persons and property.


4  Follows the recommended procedure for engine shutdown, securing the cockpit, securing rotor blades, and discharging passengers.
5.  
Performs a satisfactory post-flight inspection.

6.  
Completes the prescribed checklist, if applicable.


SECTION 2
PRIVATE PILOT
ROTORCRAFT – GYROPLANE
Practical Test Standards

CONTENTS: SECTION 2

RATING TASKS TABLE................................................................... 2-iii

CHECKLISTS:
Applicant’s Practical Test Checklist (Gyroplane)............................ 2-v
Examiner’s PracticalTest Checklist (Gyroplane)...........................2-vii

AREAS OF OPERATION:
I. PREFLIGHT PREPARATION.................................................. 2-1

A.  CERTIFICATES AND DOCUMENTS................................ 2-1

B.  WEATHER INFORMATION............................................... 2-1

C.  CROSS-COUNTRY FLIGHT PLANNING.......................... 2-2

D.  NATIONAL AIRSPACE SYSTEM...................................... 2-2

E.  PERFORMANCE AND LIMITATIONS............................... 2-3

F.  OPERATION OF SYSTEMS.............................................. 2-3

G. MINIMUM EQUIPMENT LIST............................................ 2-4

H.  AEROMEDICAL FACTORS............................................... 2-4

II. PREFLIGHT PROCEDURES.................................................. 2-5

A.  PREFLIGHT INSPECTION................................................ 2-5

B.  COCKPIT MANAGEMENT................................................2-5

C.  ENGINE STARTING .......................................................... 2-5

D.  TAXIING............................................................................. 2-6

E.  BEFORE TAKEOFF CHECK............................................. 2-6

III. AIRPORT OPERATIONS........................................................ 2-7

A.  RADIO COMMUNICATIONS AND ATC LIGHT SIGNALS........................................................ 2-7
B.  TRAFFIC PATTERNS........................................................ 2-7

C.  AIRPORT MARKINGS AND LIGHTING............................. 2-8

IV. TAKEOFFS, LANDINGS, AND GO-AROUNDS.................... 2-9

A.  NORMAL AND CROSSWIND TAKEOFF AND CLIMB................................................................................. 2-9
B.  NORMAL AND CROSSWIND APPROACH AND LANDING.......................................................................... 2-10
C.  SOFT-FIELD TAKEOFF AND CLIMB.............................. 2-11

D.  SOFT-FIELD APPROACH AND LANDING..................... 2-12

E.  SHORT-FIELD TAKEOFF AND CLIMB........................... 2-13

F.  SHORT-FIELD APPROACH AND LANDING.................. 2-14

G. GO-AROUND................................................................... 2-14

V. PERFORMANCE MANEUVER............................................2-15

STEEP TURNS.....................................................................2-15

VI.
GROUND REFERENCE MANEUVERS..............................2-16
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:PRIVATE PILOT Practical Test Standards for ROTORCRAFT HELICO(19)