• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-24 11:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Guides UP Position
All guides go to up when not commanded to down.
Forward Right Guides 1 and 2 Down Position
Forward guides 1 and 2 go to the down position when all of these events occur:
*
Joystick to FWD or AFT

*
System set to PDU RIGHT or to PDU BOTH

*
System set to PDU FWD.


EFFECTIVITY BEJ ALL  25-53-00 
Page 81 
D633W101-BEJ  Sep 05/2002 


CARGO HANDLING SYSTEM -FUNCTIONAL DESCRIPTION -LATERAL GUIDE

Forward Left Guides 2 and 3 Down Position
Forward guides 2 and 3 go to the down position when all of these events occur:
*
Joystick to FWD or AFT

*
System set to PDU LEFT or to PDU BOTH

*
System set to PDU FWD.


Aft Right Guides 1 and 2 Down Position
Aft guides 1 and 2 go to the down position when the system is set to PALLETS or when all of these events occur:
*
Joystick to FWD or AFT

*
System set to PDU RIGHT or to PDU BOTH

*
System set to PDU AFT.


Aft Left Guides 3 and 4 Down Position
Aft guides 3 and 4 go to the down position when the system is set to PALLETS or when all of these events occur:
*
Joystick to FWD or AFT

*
System set to PDU LEFT or to PDU BOTH

*
System set to PDU AFT.


EFFECTIVITY BEJ ALL  25-53-00 
Page 82 
D633W101-BEJ  Sep 05/2002 

 

CARGO HANDLING SYSTEM -FUNCTIONAL DESCRIPTION -LATERAL GUIDE

EFFECTIVITY BEJ ALL  25-53-00 
Page 83 
D633W101-BEJ  Jan 05/2002 

 

777 AIRCRAFT MAINTENANCE MANUAL

THIS PAGE IS INTENTIONALLY LEFT BLANK

25-53-00

Page 84 D633W101-BEJ Sep 05/2002

CARGO HANDLING SYSTEM -FUNCTIONAL DESCRIPTION -PDU

General
For control purposes, the powered drive units (PDUs) are in two major groups, longitudinal and lateral. The longitudinal group has two minor groups, left and right. All PDUs are also grouped by location in the compartment (bays). These are PDUs by group and location for the forward cargo handling system. The aft system is almost the same.
PDU Groups and Location 
Area  Major Group  PDUs by Row 
Forward Bays  Longitudinal  1L/R, 2L/R 
Ball Panel  Longitudinal  3L/R, 5L/R, 7L/R 
Lateral  4L/C/R, 6L/C/R 
Aft Bays  Longitudinal  8L/R through 16L/R 

Only the PDUs in a single major group operate at a given time. Within the longitudinal group, the left and right minor groups may operate independently or at the same time. You can operate all PDUs row by row. The PDUs have three conditions:
*
Erect/drive

*
Erect/brake

*
Down.


All PDUs get 115v ac, three-phase voltage from the ground handling bus. They use this ac voltage for the erection coil, motor, brake and phase reversing relays.
EFFECTIVITY
BEJ ALL

The CSC uses inputs from these switches to set the position of the PDUs:
*
Secondary joystick

*
Cargo control joystick

*
PDU forward/aft switch

*
PDU left/both/right switch

*
Pallet/container switch

*
Bay off switches.


CSC Control
Control circuits within the CSC, use phase reversing relays in the PDUs to control when and how voltage is given to the PDU motor. The circuits also control the erection coils and brake for the PDUs in the ball panel area. PDUs forward and aft of the ball panels have their erection coils and brake active when system power is on and the PDU is not in the drive condition. CSC control circuits command PDUs to erect/drive one row at a time with a small delay between rows. This reduces inrush current demands.
The bay off switches stop the drive command for rows of PDUs. This prevents PDUs from scrubbing under ULDs that are in position. The PDU rows affected by the bay off switches are different for containers and pallets. These charts show the functions of the bay off switches for the forward cargo handling system. The aft system is almost the same.
25-53-00

Page 85 D633W101-BEJ Sep 05/2002


777 AIRCRAFT MAINTENANCE MANUAL

CARGO HANDLING SYSTEM -FUNCTIONAL DESCRIPTION -PDU

Bay Off Switches (CONTAINER Mode) 
Action  Sw  Bay(s) Effected  PDU Rows Active 
Toggle On  D  D  8, 9 
Toggle On  E  D, E  8, 9, 10 
Toggle On  F  D, E, F  8, 9, 10, 11, 12 
Toggle On  G  D, E, F, G  8, 9, 10, 11, 12, 13 
Toggle On  H  D, E, F, G, H  8, 9, 10, 11, 12, 13, 14, 15 
Toggle On  I  D, E, F, G, H, I  8, 9, 10, 11, 12, 13, 14, 15, 16 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:777 AMM 飞机维护手册 Equipment and Furnishings(32)