• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-24 11:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Three large lateral guides are forward of the forward ball panels in the forward cargo compartment. Four small lateral guides are between the forward and aft ball panels in the forward cargo compartment. Four small lateral guides are forward of the ball panels in the aft cargo compartment. Four small lateral guides are aft of the ball panels in the aft cargo compartment.
EFFECTIVITY BEJ ALL  25-53-00 
Page 32 
D633W101-BEJ  Sep 05/2002 

 

CARGO HANDLING SYSTEM -LATERAL GUIDE -INTRODUCTION

EFFECTIVITY BEJ ALL  25-53-00 
Page 33 
D633W101-BEJ  Jan 05/2002 


CARGO HANDLING SYSTEM -LATERAL GUIDE -PHYSICAL DESCRIPTION

Physical Description
Lateral guides are spring loaded electrical/mechanical units. The guides have these parts:
*
Crank (2 for small guides, 3 for large guides)

*
Guide rail

*
Base

*
Electrical actuator

*
Attenuator assembly

*
Downlock pawl

*
Electrical connector

*
Uplock pawl

*
Anchor fitting (2) (large lateral guides only)

*
Vertical restraint (2) (large lateral guides only)

*
Uplock pawl release lever (large lateral guides only).


Functional Description
The electrical actuator controls the position of the guide rail. The pawls and pawl release lever manually operate the guide rail.
Training Information Point
You remove the lateral guides as a single unit.
EFFECTIVITY BEJ ALL  25-53-00 
Page 34 
D633W101-BEJ  Sep 05/2002 

 

CARGO HANDLING SYSTEM -LATERAL GUIDE -PHYSICAL DESCRIPTION

EFFECTIVITY BEJ ALL  25-53-00 
Page 35 
D633W101-BEJ  Jan 05/2002 


CARGO HANDLING SYSTEM -LATERAL GUIDE -OPERATION -LOCK DOWN

General
Normally the guide rail on the lateral guides moves electrically to down when you move cargo forward or aft. If the rail does not move electrically you can manually move and lock it down with these components:
*
Uplock pawl (small guides only)

*
Uplock pawl release lever (large guides only)

*
Guide rail

*
Down lock pawl.


Lock down
For small guides move the uplock pawl away from the crank. For large guides use the uplock pawl release lever to move the uplock pawl away from the crank. The uplock pawl is spring loaded. Hold the pawl or lever to keep the pawl away from the crank.
While you hold the pawl or the release lever push the guide rail down. The guide rail is spring loaded up.
As you hold the guide rail, move the downlock pawl to lock the guide rail down.
Release
Push and hold down the guide rail. This removes pressure on the downlock pawl.
Move the downlock pawl to unlock the guide rail.
Release the guide rail. Springs automatically move it up.
Training Information Point
If you manually lower a lateral guide, you must manually release it before it will operate electrically.
EFFECTIVITY BEJ ALL  25-53-00 
Page 36 
D633W101-BEJ  Sep 05/2002 

 

CARGO HANDLING SYSTEM -LATERAL GUIDE -OPERATION -LOCK DOWN

EFFECTIVITY BEJ ALL  25-53-00 
Page 37 
D633W101-BEJ  Jan 05/2002 


CARGO HANDLING SYSTEM -LATERAL GUIDE -OPERATION -LIFT UP

General
To lift up a lateral guide when it does not move up electrically, you must manually operate the toggle link in the attenuator assembly.
Lift up
Use a common screwdriver or similar long, thin object to trip the toggle link on the attenuator assembly. Springs lift the guide rail automatically if the toggle link is tripped correctly.
The attenuator resets automatically when the guide rail is lowered manually.
Access
Access to the toggle link is different for large and small guides.
Large guides -you access the toggle link thought a side access hole in the base of the lateral guide. This hole is on the forward side of the guide.
Small guides -you access the toggle link from the top of the lateral guide. The tool you use to the trip the toggle link fits between the rail and the base of the guide.
Training Information Point
If you manually lift a lateral guide, you do not have to move it down before electrical operation. The lateral guide will reset itself when power is put on the system.
EFFECTIVITY BEJ ALL  25-53-00 
Page 38 
D633W101-BEJ  Sep 05/2002 

 

CARGO HANDLING SYSTEM -LATERAL GUIDE -OPERATION -LIFT UP

EFFECTIVITY BEJ ALL  25-53-00 
Page 39 
D633W101-BEJ  Jan 05/2002 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:777 AMM 飞机维护手册 Equipment and Furnishings(25)