Access Panel
 113AL Forward equipment center access
 B.  Prepare for Removal
 S 864-002
 CAUTION: OPEN THESE CIRCUIT BREAKERS IN THE SEQUENCE SHOWN TO PREVENT
_______
 DAMAGE TO THE MAIN BATTERY CHARGER.
 (1)  Open this circuit breaker on the right miscellaneous electrical equipment panel (referred to as the P37 panel) and attach a DO-NOT-CLOSE tag:
 (a)  37B2, BATTERY CHARGERS MAIN
 S 864-003
 (2) Open these circuit breakers on the main power distribution panel (referred to as the P6 panel) and attach a DO-NOT-CLOSE tag:
 (a)  
AIRPLANES WITH EXTENDED STANDBY POWER; 6L7, APU/MAIN BAT TIE
 (b)  
6L8, MAIN BAT CHGR
 (c)  
6L9, HOT BAT BUS
 (d)  
6L10, BAT BUS PWR
 (e)  
6L11, INV PWR BAT
 (f)  
6L12, CENTER BUS DC
 (g)  
6F6, LANDING GEAR ALTN EXT MOTOR
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 24-31-05
 ALL  ú ú 03 Page 401 ú Sep 28/01 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
757 
MAINTENANCE MANUAL
FORWARD  MAIN  MAIN  
CENTER EQUIPMENT  BATTERY, M223  BATTERY CONNECTOR  
SEE  A 
MAIN BATTERY SHUNT 
SEE C 
MAIN  
BATTERY  
CURRENT  
MONITOR  
FWD  SEE  B  
JAMNUT  
LOCKWASHER  INBD  
FORWARD EQUIPMENT CENTER  
A  
FLAT WASHER  CONNECTOR ELECTRICAL  
TO BATTERY 
C MAIN BATTERY SHUNT  INBD FWD  BATTERY CABLE FEED-THROUGH  
TO GROUND  
B MAIN BATTERY CURRENT MONITOR 
Main Battery Current Monitor Installation 
Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 24-31-05
 ALL  ú ú 01 Page 402 ú May 28/99 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
757 MAINTENANCE MANUAL
 C. Remove the Current Monitor
 S 024-004
 (1)  Do these steps to remove the current monitor:
 (a)  
Remove the battery connector from the main battery.
 (b)  
Remove the ground lead from terminal B on the main battery shunt.
 (c)  
Move the ground lead through the current monitor.
 (d)  
Remove the electrical connector from the current monitor.
 (e)  
Remove the screws that hold the current monitor.
 (f)  
Remove the current monitor.
 TASK 24-31-05-404-005
 3. Install the Main Battery Current Monitor (Fig. 401)
________________________________________
 A. References
 (1)  AMM 24-22-00/201, Electrical Power - Control
 B. Access
 (1)  
Location Zone
 113/114 Area forward of NLG wheel well
 (2)  
Access Panel
 113AL Forward equipment center access
 C. Install the Current Monitor
 S 424-011
 (1)  Do these steps to install the current monitor:
 (a)  Hold the current monitor so the BAT end of the current monitor points to the main battery.
 NOTE: Make sure you align the GND and BAT sides of the current
____ monitor as shown (Fig. 401).
 (b)  
Move the battery ground lead through the current monitor.
 (c)  
Put the current monitor in position.
 