10-11-02
ALL ú ú 02 Page 231 ú Mar 20/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| ................................................................................. | F. The rudder (three cycles) | X | | | | | X | | | | (AMM 27-21-00). | | | | | | | | | ................................................................................. | G. The horizontal stabilizer | X | | | | | X | | | | (three cycles). | | | | | | | | | ................................................................................. | 2. After the flight controls have been | X | | | | | X | | | | cycled, put the flaps and slats to | | | | | | | | | | the retracted position. Also put the| | | | | | | | | | control surfaces to the neutral | | | | | | | | | | position. | | | | | | | | | .................................................................................
| 3. Initially and at each 90-day cycle, | X | | | | | X | | |
| operate the stabilizer trim, | | | | | | | | |
| the rudder trim and the aileron | | | | | | | | |
| trim for one complete cycle. | | | | | | | | |
| Put the stabilizer trim, the | | | | | | | | |
| rudder trim, and aileron trim to | | | | | | | | |
| a different position than it was set | | | | | | | | |
| during the last cycle. | | | | | | | | |
| | | | | | | | | |
| NOTE:____ You can use external | | | | | | | | |
| electrical and hydraulic | | | | | | | | |
| power when the airplane | | | | | | | | |
| power is not available. | | | | | | | | |
................................................................................. | 4. Initially and at each 90-day cycle, | X | | | | | X | | | | lubricate the flap jackscrew and | | | | | | | | | | ballnut assemblies with MIL-G-23827 | | | | | | | | | | (AMM 12-21-09/301). | | | | | | | | | ................................................................................. | 5. Visually examine the condition of | X | | | | | X | | | | all control cables (AMM 20-20-02/601)| | | | | | | | | | Relubricate the the control cables in| | | | | | | | | | the trailing edge and wheel wells | | | | | | | | | | (AMM 12-21-31-301). | | | | | | | | | ................................................................................. | 6. Relubricate all control cables | X | | | | | | X | | | except the control cables through | | | | | | | | | | the body of the airplane, if they | | | | | | | | | | were lubricated within 60 days | | | | | | | | | | prior to the start of the storage. | | | | | | | | | | Do this on day 180 and at 180-day | | | | | | | | | | intervals (AMM 12-21-31/301). | | | | | | | | |
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
10-11-02
ALL ú
ú 02 Page 232
ú Mar 20/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
~............................................................................... | | Procedures Repeat Intervals (Days) | | ....................................... | | | | | | | | | As| | Item | Initial | 7 | 14| 30| 60| 90|180|Rqd| .................................................................................
| 7. Apply a layer of MIL-C-16173, Grade 2| X | | | | | X | | |
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 PARKING, MOORING, STORAGE & RETURN TO S(28)