S 862-011
(10) Close and latch all doors and hatches which must hold pressure.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
05-51-24
ú ALL ú
ú ú ú 01.101 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. Page 207Sep 28/02
A
757
MAINTENANCE MANUAL
S 212-071
CAUTION:_______ MAKE SURE THAT YOU REMOVE POWER TO ALL PROPELLER OR IMPELLER
TYPE FANS (EXCEPT EQUIPMENT COOLING FANS) WITHIN THE
PRESSURIZED CABIN IF THE PRESSURE WILL EXCEED 15.7 PSIA.
PRESSURE GREATER THAN 15.7 PSIA CAN CAUSE THE FAN TO WORK TOO
HARD AND OVERHEAT. THIS CAN CAUSE DAMAGE TO THE FAN.
CAUTION:_______ DISABLING THE WARNING HORN REDUCES THE FAILURE INDICATION OF
THE FORWARD ELECTRICAL EQUIPMENT COOLING FAN TO THE " EQPT
OVHT" LIGHT AND "EQPT OVHT" MESSAGE. ENSURE THE NOTE PROVIDED
IN SECTION THAT CONCERNS POTENTIAL OVERHEAT FO THE FORWARD
ELECTRICAL EQUIPMENT COOLING SUPPLY FANS IS ADHERED TO.
PRESSURIZED CABIN IF THE PRESSURE WILL EXCEED 15.7 PSIA.
PRESSURE GREATER THAN 15.7 PSIA CAN CAUSE THE FAN TO WORK TOO
HARD AND OVERHEAT. THIS CAN CAUSE DAMAGE TO THE FAN.
CAUTION:_______ TO PROTECT LRU DAMAGE, LIMIT THE TIME THE LEFT RECIRCULATION
FAN IS OFF TO 30 MINUTES AND TURN WEATHER RADAR OFF. FAILURE
TO FOLLOW THESE INSTRUCTIONS CAN LEAD TO DAMAGE TO ELECTRICAL
EQUIPMENT.
(11)
Open the circuit breakers listed below to inactivate the ground warning horn from sounding when the left recirulation fan is turned off.
S 212-069
(12)
Make sure that the following circuit breaker on the panel, P11, is open:
(a)
11C20 Equip Cooling Smoke Det Cont - Overboard Exhaust Valve (if installed) (AMM 21-58-05/401) .
(b)
11N13, EQUIP COOLING LOW FLOW DET.
(c)
6D6, EQUIP COOL GND WARN AND TEST.
S 212-072
(13)
Set the left recirculating fan switch to on.
S 862-048
(14)
Set the right recirculating fan switch to off.
NOTE: The 11C20 circuit breaker must be closed prior to turning off
the left recirculating fan in order to pressurize the airplane.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
05-51-24
ú ALL ú
ú ú ú 01.101 ú BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. Page 208Sep 28/02
A
757 MAINTENANCE MANUAL
E. Procedure
S 792-012
(1) Do the Leakage Test.
(a) Start the APU, and use it as a pressure source (Ref 49-11-00).
NOTE: If it is necessary, a pneumatic service cart can be
____
used.
(b)
Turn the L and the R Pack Control Selectors on the panel, P5, to AUTO. 1) Operate the zone selectors in AUTO at approximately 75°F
(12 o'clock position) (AMM 21-51-00/601).
(c)
After the air conditioning system has become stable, move the MANUAL Cabin Altitude Control switch on the panel, P5, to DESCEND. 1) This will close the outflow valve.
WARNING: DO NOT INCREASE PRESSURE MORE THAN 1000 FEET A MINUTE (0.5
_______ PSI A MINUTE). IF YOU INCREASE THE PRESSURE MORE THAN 1000 FEET A MINUTE (0.5 PSI A MINUTE), INJURY TO PERSONS OR DAMAGE TO THE AIRPLANE STRUCTURE CAN OCCUR.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 时间限制/维护检查(40)