507 Standby Hydraulic System Leak Check
Jun 20/90 Figure 608 29-00
Page 629
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.
STEP TITLE PARAGRAPH IN AMMETER FLOWMETER
SECTION 1.C.(9) AMPS CC/MIN CC/MIN
1 A AIL. + BASIC REF (f)4) ____ ____
2 B AIL. + BASIC REF (f)7) ____ ____
3 BASIC REF (f)9) ____ ____
4=2-3 B AIL. A/P ACTUATOR LEAKAGE (f)10) ____ ____ ____
5=1-3 A AIL. A/P ACTUATOR LEAKAGE (f)11) ____ ____ ____
6 NEW BASIC REF (g)2) ____ ____
7 A AIL. + ELEV + NEW BASIC REF (g)4) ____ ____
8 B AIL. + ELEV + NEW BASIC REF (g)7) ____ ____
9=7-(5+6) A ELEV A/P ACTUATOR LEAKAGE (g)9) ____ ____ ____
10=8-(4+6) B ELEV A/P ACTUATOR LEAKAGE (g)10) ____ ____ ____
AFCS BITE Autopilot Actuator (SP 177 Only) Internal Leakage 512
29-00 Test Data Sheet – Procedure 5 Jun 20/90
Page 630 Figure 609
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.
580 Standby Rudder Actuator
Jun 20/90 Figure 610 29-00
Page 631
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.
EFFECTIVITY
AIRPLANES WITH THE ENHANCED RUDDER CONTROL SYSTEM (RSEP) (POST-SB 27-1252)
2. Internal Leak Check for the Rudder Power Control Unit (Procedure 6)
A. General
(1) Use this procedure to find the internal leakage of the rudder power control unit for hydraulic system A or B.
B. Reference
(1)
AMM 24-22-0/201, Manual Control
(2)
AMM 27-21-0/201, Rudder and Rudder Trim Control System
(3)
AMM 29-11-0/201, Hydraulic System A
(4)
AMM 29-12-0/201, Hydraulic System B
C. Access
(1)
Location Zones
12 Electronic Compartment
95 Vertical Fin
(2)
Access Panels
1201 Electronic Equipment Access Door
9510 TE Access Door
9512 TE Access Panel - Rudder
9514 TE Access Panel - Rudder
9559 Cover - Rudder Nose
D. Prepare for the Main Rudder PCU Internal Leakage Check
(1)
Make sure this circuit breaker is closed:
(a) P6-2, Circuit Breaker Panel:
1) RUDDER LOAD LIMITER
(2)
Open the access door 9510.
(3)
Remove the access panels 9512 and 9514 from the vertical fin.
(4)
Do this task: Supply electrical power (AMM 24-22-0/201).
WARNING: MAKE SURE THET PERSON AND EQUIPMENT ARE CLEAR OF ALL CONTROL SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDERS, ELEVATORS, FLAPS, SLATS, SPOILERS, LANDING GEAR, AND THRUST REVERSERS CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURY TO PERSONS OR DAMAGE EQUIPMENT.
(5)
Do this task: "Rudder Hydraulic System A and B Pressurization" (AMM 27-21-0/201).
(6)
Put the FLT CONTROL A and B switches, on the P5-3 panel, to the ON position.
(7)
Move the rudder pedals through 5 cycles of full travel.
(a) Move the rudder pedals until the rudder is in approximate center position.
(8)
Open the Electronic Equipment Access Door, 1201 to gain access to the main electronics equipment compartment.
(9)
Use a digital voltmeter to verify 4.38 Vdc to 5.62 Vdc between pin 1 and pin 2 of connector D10070 on the E2 shelf (stanchion station 351) in the EE bay.
(10)
Verify that the STBY RUD ON Light on the overhead panel P5-3 is not illuminated.
(11)
Put the FLT CONTROL A switch, on the P5-3 panel, to the OFF position.
597 29-00 May 01/03 Page 632
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.
E. Rudder Main PCU System B Internal Leakage Check in the Extend Direction
NOTE: You will need 3 persons to complete this task.
There is a time limit to complete some of the steps in this task.
(1) Use the Yaw Damper Coupler (YDC) to command the Rudder Pressure Reducer to the "Low" pressure state:
(a)
Push the ON/OFF key on the BITE keypad on the face of the yaw damper coupler located on the E1-3 shelf. 1) Make sure that the display shows ENTER BITE?
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 液压 HYDRAULIC POWER(22)