FLIGHT CONTROLS MULTIPLE USE SYSTEMS/COMPONENTS
CONTROL CABLE SYSTEMS ................................................................................... 27-09-100 Description and Operation
Flight Control Cables ............................................................................................... 27-09-111 Maintenance Practices
Flight Control Cables Air Pressure Seals ................................................................ 27-09-121 Maintenance Practices
Flight Control Cable Guard ...................................................................................... 27-09-122 Removal/Installation
FLIGHT CONTROLS HYDRAULIC MODULAR PACKAGE....................................... 27-09-200
Description and Operation
Compensator Cartridge
Flight Controls and Spoiler Shutoff Valves
Low Pressure Warning Switch
Removal/Installation
Adjustment/Test
Flight Controls Shutoff Valve ................................................................................... 27-09-211 Removal/Installation Adjustment/Test
Spoiler Shutoff Valve ............................................................................................... 27-09-221 Removal/Installation Adjustment/Test
Compensator Cartridge............................................................................................ 27-09-231 Removal/Installation
Low Pressure Warning Switch................................................................................. 27-09-241 Removal/Installation Adjustment/Test
506
Oct 20/91 BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. Contents 27 Page 1
Subject Subject No.
TAKEOFF WARNING SYSTEM (Ref 31-26-0)
Flap Takeoff Warning Switch (Ref 31-26-23)
Stabilizer Takeoff Warning Switches (Ref 31-26-24)
Speed Brake Takeoff Warning, Arming and Autobrake Off Ramp Switch (Ref 31-26-26)
Thrust Lever Actuated Takeoff Warning Switches (Ref 31-26-21)
FLIGHT CONTROLS TRIM CORRECTION ............................................................... Trouble Shooting Adjustment/Test 27-09-400
FLIGHT CONTROLS SHEAR RIVETS....................................................................... Maintenance Practices 27-09-500
FLIGHT CONTROL SURFACE .................................................................................. Inspection/Check 27-09-600
FLIGHT CONTROL SURFACE RIGGING TOOLS .................................................... Maintenance Practices 27-09-700
FLIGHT CONTROL SURFACE INTERCHANGEABILITY.......................................... Maintenance Practices 27-09-800
535
Contents 27 Page 2 BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. Jun 20/85
Subject Subject No.
AILERON AND TAB
AILERON AND AILERON TRIM CONTROL SYSTEM .............................................. 27-11-0
Description and Operation
Aileron
Aileron Balance Panels and Seals
Aileron Balance Tab
Aileron Wing Quadrant
Aileron Centering Spring and Trim Mechanism
Aileron Control Linkage
Aileron Power Control Unit
Aileron Transfer Mechanism
Aileron Trim Control Unit
Balance Tab Linkage
Trouble Shooting
Maintenance Practices
Application of Hydraulic Power
Adjustment/Test Subject Subject No.
505
Aug 01/75 BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. Contents 27 Page 2A/2B
Ailerons .................................................................................................................... 27-11-11 Removal/Installation Inspection/Check Approved Repairs
Aileron Balance Tab................................................................................................. 27-11-21 Removal/Installation Inspection/Check
Aileron Balance Panel and Seals............................................................................. 27-11-31 Removal/Installation Inspection/Check
Aileron Control Wheel.............................................................................................. 27-11-41 Removal/Installation
Aileron Control Wheel Drum .................................................................................... 27-11-51 Removal/Installation Adjustment/Test Inspection/Check
Aileron Transfer Mechanism.................................................................................... 27-11-61 Removal/Installation
Aileron Power Control Unit....................................................................................... 27-11-71 Removal/Installation Adjustment/Test
Aileron Centering Spring and Trim Mechanism....................................................... 27-11-81 Removal/Installation Adjustment/Test Inspection/Check
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(7)