D. With the throttle control lever in the IDLE STOP position, make sure that you can:
(1) easily install the pin (5) in the artificial feel unit (1)
(2) easily remove this pin from the artificial feel unit (1)
(3) install the pin again.
(4) Make sure that you can :
(5) easily install the RIGGING PIN (98DNSA20206080) (3) in the throttle control unit (4) and in the input lever,
(6) easily remove this pin from these components.
(a) If you can not do this, adjust the length of the rod (2). Subtask 76-11-00-710-053
E. Do an operational test of the FLOOD LT/ING LT panel 111VU and FLOOD LT panel 112VU :
(1) Operate the light adjustment knobs of the FLOOD LT/INTEG LT panel 11VU and FLOOD LT panel 112VU.
(2) Make sure that the light intensity of the glareshield 13VU, F/O glareshield panel 130VU, CAPT glareshield panel 131VU and overheard control & indicating panel 48VU changes.
F 『 EEFF : ALL E Page 51076-11-00
E E Feb 01/98 E E ECES E E 56-5B E
F 『
E C F M E
E E
E E TASK 76-11-00-820-045
Adjustment of the Artificial Feel Unit
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific warning notice
No specific access platform 1.8 m (5 ft. 11 in.)
98D76103000000 1 THROTTLE LEVER LOAD MEASURE
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific lockwire 0.032 in. (0.8mm) dia.
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
76-11-00-991-913 Fig. 504
F 『 EEFF : ALL E Page 51176-11-00
E E Feb 01/98 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
3. Job Set-up
__________
Subtask 76-11-00-865-061
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08
R 105VU FLT CTL/SEC1/STBY SPLY 22CE B01
R 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18
Subtask 76-11-00-941-057
B. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 76-11-00-480-052
C. Install the THROTTLE LEVER LOAD MEASURE (98D76103000000) on the throttle control levers.
Subtask 76-11-00-941-058
D. Put an access platform below the forward avionics compartment.
F 『 EEFF : ALL E Page 51276-11-00
E E Feb 01/99 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
Subtask 76-11-00-010-056
E. Open the access door 811.
4. Procedure
_________
(Ref. Fig. 504/TASK 76-11-00-991-913)
Subtask 76-11-00-020-052
A. Loosen the three screws (3). Remove the guard (7).
(1) Cut and remove the lockwire from the lock nut (6). Loosen the lock nut.