B. Close Access
(1) Remove the access platform(s).
(2) Close the access door 811
(3) Remove the warning notice(s). Subtask 76-11-17-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1JH, 2JH1, 2JH2, 3JH1, 3JH2, 21CE1, 21CE2, 21CE3, 22CE, 1LE, 2LE, 4LF.
Subtask 76-11-17-710-052
D. Do an operational test of the panels FLOOD LT/INTEG LT PNL 111VU and FLOOD LT PNL 112VU:
(1) operate the light adjustment knobs of the panels FLOOD LT/INTEG LT PNL 111VU and FLOOD LT PNL 112VU.
(2) Make sure that the light intensity of the glareshield panels 13VU, F/O glareshield panel 130VU, captain glareshield panel 131VU, and overhead CTL & IND panel 48VU changes.
F 『 EEFF : ALL E Page 41576-11-17
E E Feb 01/98 E E ECES E CONTROL UNIT - THROTTLE (8KS1,8KS2) - REMOVAL/INSTALLATION
F 『
E C F M E
E E
E 56-5B E
E E
__________________________________________________________
TASK 76-11-19-000-042
Removal of the Throttle Control Unit (8KS1, 8KS2)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific access platform 1.5 m (4 ft. 11 in.)
98DNSA20208080 1 RIGGING PIN
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
76-11-19-991-908 Fig. 401
76-11-19-991-909 Fig. 402
76-11-19-991-910 Fig. 403
3. Job Set-up
__________
Subtask 76-11-19-865-057
A. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8KS1
49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04 121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41 FOR 8KS2 49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05 121VU ENGINE/ENG2/FADEC B 4KS2 Q40
F 『 EEFF : ALL E Page 40176-11-19
E E Feb 01/98 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
Subtask 76-11-19-010-051
B. Get Access
(1) Put the access platform
(2) Open the access door 811
Subtask 76-11-19-869-056
C. Make sure that the throttle control levers are set to idle (0 degree TLA).
4. Procedure
_________ (Ref. Fig. 401/TASK 76-11-19-991-908, 402/TASK 76-11-19-991-909, 403/TASK 76-11-19-991-910)
Subtask 76-11-19-020-055
A. Disconnect Connectors
(1) Disconnect the four connectors (12).
(2) Put blanking caps on the disconnected electrical connectors.
Subtask 76-11-19-480-052
B. Install the RIGGING PIN (98DNSA20208080) (13) in the artificial feel unit of the throttle control.
Subtask 76-11-19-020-051
C. Removal of the Throttle Control Unit.
(1) Remove and discard the cotter pin (5).
(2) Remove the nut (6), the washer (7) and the bolt (2). Make sure that the bush (3) stays bonded to the bolt (2).
(3) Remove and discard the three cotter pins (8).
(4) Remove the three nuts (9), washers (10) and bolts (1) which attach the throttle control unit (11) to its support.
(5) Remove the throttle control unit 8KS1 (8KS2)(11).
F 『 EEFF : ALL E Page 40276-11-19
E E Feb 01/98 E E ECES E
Throttle Control Unit - Access and Location
Figure 401/TASK 76-11-19-991-908
F EEFF : ALL 『E 76-11-19 Page 403
E E Feb 01/98
E E
ECES E
Throttle Control Unit - Removal/Installation
Figure 402/TASK 76-11-19-991-909
F EEFF : ALL 『E 76-11-19 Page 404
E E Feb 01/98
E E
ECES E
Throttle Control Unit- Rigging
Figure 403/TASK 76-11-19-991-910
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ENGINE CONTROLS 发动机控制(12)