(4) Install the 3 screws (17).
(5) Install the lever (29): push the lever to connect the connector located inside at the lever-to-bellcrank junction.
(6) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-007A) on the 2 screws (15).
(7) Install the 2 screws (15) and the 2 hollow pins (13).
(8) Assemble the trigger (27) and the link (25) with the pin (26).
F 『 EEFF : ALL E Page 41976-11-41
E E Nov 01/00 ERE
ECES E (9) Engage the trigger (27) in the lever (29) and install the hollow pin
F 『
E C F M E
E E
E 56-5B E
E E
(24) and the screw (28).
(10) Install the index (16) and the 2 screws (14).
(11) Install the index (22) and the 2 screws (23).
(12) Put the two control levers in the idle position (0 degree TLA) and engage the two links.
(13) If necessary install 2 new bushings (33) on the screws (34) and bond them with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-029).
(14) Install the 2 screws (34), the 2 washers (32) and the 2 nuts (31).
(15) Install 2 new cotter pins (30). Subtask 76-11-41-080-052
D. Remove the rigging pin (11) from the artificial feel unit.
5. Close-up
________ Subtask 76-11-41-410-054
A. Close Access
(1) Install the pitch trim control mechanism (Ref. TASK 27-41-41-400-001).
(2) Install the plates (4) and (10).
(Ref. Fig. 402/TASK 76-11-41-991-915)
(3) Install the screws (6) and the washers (5).
(4) Install the clamps (9).
(5) Install the ventilation plates (8).
(6) Install the screws (7).
(7) Install the FLOOD LT/INTEG LT panel 111VU and FLOOD LT panel 112VU. (Ref. Fig. 401/TASK 76-11-41-991-914)
NOTE : The installation procedure is the same for the panels FLOOD
____ LT/INTEG LT panel 111VU and FLOOD LT panel 112VU.
F 『 EEFF : ALL E Page 42076-11-41
E E Nov 01/00 ERE
ECES E
F 『
E C F M E
E E
E 56-5B E
E E
(a) Remove the blanking caps from the connectors (2) and (3).
(b) Install the connector (3) on the panel (1).
(c) Install the panel (1) on the structure.
(d) Fully tighten the fasteners on the panel (1).
(8) Install the Multipurpose Control and Display Units (3CA1 and 3CA2) (Ref. TASK 22-82-12-400-002).
(9) Install the Radio Management Panels (1RG1 and 1RG2) (Ref. TASK 23-13-13-400-001).
(10) Install the Audio Control Panels (2RN1 and 2RN2) (Ref. TASK 23-51-12-400-001).
(11) Install the Weather Radar Control Unit (3SQ) (Ref. TASK 34-41-12-400-001).
(12) Install the ATC Control Unit (3SH) (Ref. TASK 34-52-12-400-001). Subtask 76-11-41-410-055
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
(4) Remove the warning notice(s).
Subtask 76-11-41-865-058
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1JH, 2JH1, 2JH2, 3JH1, 3JH2, 21CE1, 21CE2, 21CE3, 22CE, 1LE, 2LE, 4LF.
Subtask 76-11-41-861-051
D. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
F 『 EEFF : ALL E Page 42176-11-41
E E Nov 01/00 ERE ECES E
F 『
E C F M E
E E
E 56-5B E E E Subtask 76-11-41-710-052
E. Do an operational test of the FLOOD LT/INTEG LT panel 111VU and FLOOD LT panel 112VU:
(1) Operate the light adjustment knobs of the FLOOD LT/INTEG LT panel 111VU and FLOOD LT panel 112VU.
(2) Make sure that the light intensity of the glareshield panel 13VU, F/O glareshield panel 130VU, CAPT glareshield panel 131VU and overhead control and indicating panel 48VU changes.
Subtask 76-11-41-869-057
F. DO the EIS start procedure (Ref. TASK 31-60-00-860-001). Subtask 76-11-41-710-054
G. Do the test that follows:
(1) Move the ENG1 and ENG2 throttle control levers from MAX REV to MAX T/O.
(a) On the upper ECAM DU, make sure that the small white circle on the N1 indication follows the throttle control lever position.
(b) Make sure that the movement is smooth, without friction point.
(2) Do an operational test of the AFS (Ref. TASK 22-96-00-710-001). NOTE : If the aircraft is operated in cat 3 conditions, do the LAND 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM ENGINE CONTROLS 发动机控制(19)