• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2011-03-20 15:27来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

kgs.:

OVERRIDE pumps 2 and 3 switches -Off
CROSSFEED valve 1 and 4 switches -Off
Cancel when review completed. Status Display ................................................................................ Select Trim ..................................................................................................... Set
Stabilizer trim – ___ UNITS
Set for takeoff.
Check in illuminated greenband.

Aileron trim – ZERO Rudder trim – ZERO Flight controls ................................................................................Check
Copyright . The Boeing Company. See title page for details.
NP.20.16 D6-30151-425 December 19, 2000

Normal Procedures -Amplified Procedures 747 Operations Manual
Displace rudder, control wheel, and control column
full travel in both directions. Verify freedom of
movement, controls return to center, and proper
flight control movement on secondary EICAS display.

Note: Hold nose wheel steering tiller stationary during rudder check to prevent nose wheel movement. Secondary ENGINE display switch .................................................Push Verify secondary engine display appears.
EICAS displays ............................................................................. Check Engine indications -Normal Accomplish remaining items on BEFORE START checklist.
Copyright . The Boeing Company. See title page for details.
December 19, 2000 D6-30151-425 NP.20.17
Normal Procedures -Amplified Procedures

Engine Start Procedure
Normal start sequence is 4, 3, 2, 1.
Two engines may be started simultaneously.

Captain  First Officer 
Call “START ____ .”  Pull engine start switch(es). 
Position engine ____ fuel control switch(es) to run. 
Observe oil pressure increase. * 
Monitor engine displays for start parameters listed below until engine(s) are stabilized at idle: . N1 rotation and *oil pressure must be indicated by idle N2. After engine(s) stabilized at idle, repeat procedure to start remaining engines. Autostart takes corrective action for the following non-normal conditions: .No EGT rise .Hot start . Hung start. (*During cold weather starts, initial oil pressure rise may be higher than normal.) 

Copyright . The Boeing Company. See title page for details.
NP.20.18 D6-30151-425 December 19, 2000

Normal Procedures -Amplified Procedures 747 Operations Manual
After Start Procedure
APU selector ..................................................................................... OFF

Hydraulic demand pump selectors ................................................AUTO

NACELLE ANTI–ICE switches............................................As required

AFT CARGO HEAT switch .................................................. As required

Pack control selectors ...................................................................NORM

RECALL switch ...............................................................................Push

Verify only appropriate alert messages displayed.
Cancel when review completed. CDU ............................................................................................... Check
Verify takeoff speeds selected.
Ground equipment ........................................................................... Clear

Accomplish AFTER START checklist.
Before Takeoff Procedure
Pilot Flying  Pilot Not Flying 
Obtain taxi clearance 
Brief taxi clearance 
Release parking brake. 
Call for “FLAPS _____” as required for takeoff.  Position Flap lever to takeoff setting. 
Accomplish takeoff briefing. 
Notify flight attendants. 
Call for “BEFORE TAKEOFF CHECKLIST”.  Accomplish BEFORE TAKEOFF checklist. 

Copyright . The Boeing Company. See title page for details.
December 19, 2000 D6-30151-425 NP.20.19
Normal Procedures -Amplified Procedures 747 Operations Manual

Takeoff Procedure
Pilot Flying  Pilot Not Flying 
Align airplane with runway.  Position Inboard Landing Lights and Strobe Light switches ON. Position Transponder Mode selector to TA/RA. 
Advance Thrust levers to approximately 70% N1 and allow engines to stabilize. Push TO/GAswitchtoadvance Thrust levers to takeoff thrust, or manually advance Thrust levers to takeoff thrust. 
Verify correct takeoff thrust set.  Monitor engine instruments throughout takeoff. Adjust takeoff thrust prior to 80 knots if required. 
Note: After takeoff thrust is set, Captain’s hand must be on Thrust levers until V1. 
Verify 80 knots.  Call “80 KNOTS.” 
Monitor airspeed noting V1. Rotate at VR. Establish positive rate of climb.  Call “V1.” At VR, call “ROTATE.” Monitor airspeed and vertical speed. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-441 Operations Manual 747操作手册(42)