05-25-70-991-003 Fig. 602 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
05-25-70-991-003-A Fig. 602A
**ON A/C ALL
3. Job Set-up
__________
Subtask 05-25-70-866-050
A. Aircraft Maintenance Configuration
(1) Fully extend the flaps. (Ref. TASK 27-50-00-866-008).
**ON A/C 001-049, 051-057, 101-101,
Subtask 05-25-70-010-051
B. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels
571AB, 572AB, 572BB.
(Ref. Fig. 601/TASK 05-25-70-991-001)
671AB, 672AB, 672BB.
(Ref. Fig. 602/TASK 05-25-70-991-003)
Access Panels of the Left Wing Lower Trailing Edge
Figure 601/TASK 05-25-70-991-001
R 1EFF : 001-049, 051-057, 101-101, 1 05-25-70Page 605 1 1 May 01/05 1 1 1CES 1
Access Panels of the Left Wing Lower Trailing Edge
Figure 601A/TASK 05-25-70-991-001-A
R 1EFF : 058-099, 102-149, 151-199, 201-299, 1 05-25-70Page 606 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Access Panels of the Right Wing Lower Trailing Edge
Figure 602/TASK 05-25-70-991-003
R 1EFF : 001-049, 051-057, 101-101, 1 05-25-70Page 607 1 1 May 01/05 1 1 1CES 1
R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
Subtask 05-25-70-010-051-A
B. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels
571AB.
(Ref. Fig. 601A/TASK 05-25-70-991-001-A)
671AB.
(Ref. Fig. 602A/TASK 05-25-70-991-003-A)
**ON A/C ALL
4. Procedure
_________ Subtask 05-25-70-210-051
A. Inspection
(1)
Do a visual inspection of the shroud box.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations are attached correctly.
5. Close-up
________ **ON A/C 001-049, 051-057, 101-101,
Subtask 05-25-70-410-051
A. Close Access
(1)
Install the access panels
571AB, 572AB, 572BB.
671AB, 672AB, 672BB.
(2)
Remove the access platform(s).
Access Panels of the Right Wing Lower Trailing Edge Figure 602A/TASK 05-25-70-991-003-A
R 1EFF : 058-099, 102-149, 151-199, 201-299, 1 05-25-70Page 609 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
Subtask 05-25-70-410-051-A
A. Close Access
(1) Install the access panels
571AB.
671AB.
(2) Remove the access platform(s).
**ON A/C ALL
Subtask 05-25-70-866-051
B. Aircraft Maintenance Configuration
(1) Retract the flaps. (Ref. TASK 27-50-00-866-009)
TASK 05-25-70-200-003
Zonal Inspection of the Inboard Fixed Trailing Edge Structure from the Shroud Box to the Rib 9
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______ DEPLOYED IN THE 45 DEG. POSITION.
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-573-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2.50 m (8 ft. 2 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-50-00-866-008 Extension of the Flaps on the Ground 27-50-00-866-009 Retraction of the Flaps on the Ground 27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
3. Job Set-up
__________ Subtask 05-25-70-866-052
A. Aircraft Maintenance Configuration
(1) Extend the spoilers (Ref. TASK 27-60-00-866-002)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 1(84)