ZONAL INSPECTION : WING DRY BAY (OUTBOARD) - INSPECTION/CHECK
_____________________________________________________________
TASK 05-25-60-200-001
Zonal Inspection of the Dry Bay (Outboard)
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-560-01
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R R R R 57-27-11-000-002 57-27-11-400-002 Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....) Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
3. Job Set-up__________
Subtask 05-25-60-010-050
A. Get Access
(1) Put an access platform in position.
R (2) Remove the access panel 560AB, (Ref. TASK 57-27-11-000-002). 660AB
4. Procedure
_________
Subtask 05-25-60-210-050
A. Inspection
(1)
Do a general visual inspection of the dry bay (outboard).
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (ducting, piping) are attached correctly.
5. Close-up
________
Subtask 05-25-60-410-050
A. Close Access R (1) Install the access panel 560AB, 660AB. (Ref. TASK 57-27-11-400-002)
(2) Remove the access platform(s).
ZONAL INSPECTION : AFT SECTION OF WING AND TRAILING EDGE FIXED STRUCTURE
________________________________________________________________________ INSPECTION/CHECK
________________
TASK 05-25-70-200-001
Zonal Inspection as far as visible of the Main Landing Gear Bay
1. Reason for the Job__________________ Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access
3. Job Set-up
__________ Subtask 05-25-70-010-050
A. Get Access
(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).
4. Procedure
_________ Subtask 05-25-70-210-050
A. Inspection
(1)
Do a general visual inspection of the main landing-gear bay from the ground.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
1EFF : ALL 1 05-25-70Page 601 1 1 May 01/05R 1 1 1CES 1
5. Close-up
________
Subtask 05-25-70-410-050
A. Close Access
(1) Close the main gear doors (Ref. TASK 32-12-00-410-001).
1EFF : ALL 1 05-25-70Page 602 1 1 May 01/05R 1 1 1CES 1
TASK 05-25-70-200-002 Zonal Inspection of the Shroud Box WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-572-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
**ON A/C 001-049, 051-057, 101-101, 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 1(83)