• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-11 09:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  A. Aircraft Maintenance Configuration 
R  (1) Extend the slats (Ref. TASK 27-80-00-866-004)

 

R Subtask 05-25-20-010-051

R  B. Get Access 
R  (1) Put an access platform in position. 
R  (2) Remove the access panels 
R  (Ref. Fig. 601/TASK 05-25-20-991-001, 602/TASK 05-25-20-991-002) 
R  522AB, 522AT, 522BT, 
R  522CB, 522EB, 522FB, 
R  522HB, 522JB, 522KB, 
R  522LB, 522NB, 522QB, 
R  522SB, 522UB. 
R  622AB, 622AT, 622BT, 
R  622CB, 622EB, 622FB, 
R  622HB, 622JB, 622KB, 
R  622LB, 622NB, 622QB, 
R  622SB, 622UB. 
R  4. Procedure_________ 
R  Subtask 05-25-20-210-051 
R  A. Inspection 
R  (1) Do a general visual inspection of the structure of the outboard fixed 
R  leading edge. 
R  (2) Make sure that there are no signs of corrosion, cracks or damage. 
R  (3) Make sure that all the installations (wiring, ducting, piping) are 
R  attached correctly. 
R  5. Close-up________ 
R  Subtask 05-25-20-410-051 
R  A. Close Access 
R  (1) Install the access panels 
R  522AB, 522AT, 522BT, 
R  522CB, 522EB, 522FB, 
R  522HB, 522JB, 522KB, 
R  522LB, 522NB, 522QB, 
R  522SB, 522UB. 
R  622AB, 622AT, 622BT, 
R  622CB, 622EB, 622FB,

 

R  622HB, 622JB, 622KB, 
R  622LB, 622NB, 622QB, 
R  622SB, 622UB. 
R  (2) Remove the access platform(s). 
R  Subtask 05-25-20-866-053 
R  B. Aircraft Maintenance Configuration 
R  (1) Fully retract the slats (Ref. TASK 27-80-00-866-005) 
R

 

 ZONAL INSPECTION : WING FLAP TRACK FAIRINGS AND WING TIP - INSPECTION/CHECK
___________________________________________________________________________
 TASK 05-25-30-200-001
 Zonal Inspection of the Flap Track No. 2 and Fairing
 WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
 DEPLOYED IN THE 45 DEG. POSITION.

 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: ZL-531-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
27-50-00-866-008 Extension of the Flaps on the Ground
 27-50-00-866-009 Retraction of the Flaps on the Ground


R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 05-25-30-991-001 Fig. 601
 **ON A/C 301-399,

 05-25-30-991-001-A Fig. 601A

 **ON A/C ALL


 3. Job Set-up
__________
 Subtask 05-25-30-866-050

 A. Aircraft Maintenance Configuration
 (1) Fully extend the flaps (Ref. TASK 27-50-00-866-008). Subtask 05-25-30-010-050
 B. Get Access
 (1) Put an access platform in position.
 (2) Remove the access panels: R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 601/TASK 05-25-30-991-001)
 **ON A/C 301-399,

 (Ref. Fig. 601A/TASK 05-25-30-991-001-A)
 **ON A/C ALL

 531AT, R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 601/TASK 05-25-30-991-001)
 **ON A/C 301-399,

 (Ref. Fig. 601A/TASK 05-25-30-991-001-A)


 Access Panels of the Flap Track Fairings
 Figure 601/TASK 05-25-30-991-001

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 05-25-30Page 603 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


R  Access Panels of the Flap Track Fairings 
R  Figure 601A/TASK 05-25-30-991-001-A 
R 1EFF :  301-399,  1  05-25-30 Page 604 
1  1  May 01/04
 1  1
 1CES  1

 

 **ON A/C ALL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 1(73)