R Subtask 05-51-11-210-066
R S. Inspection of the Tail Unit (Ref. TASK 55-10-00-210-001) (Ref. TASK 55-R 30-00-200-001) (Ref. TASK 49-16-00-210-001) (Ref. TASK 55-16-00-200-001) R (Ref. TASK 55-36-00-210-001)
R -------------------------------------------------------------------------------R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| R | |CODE| | 1 | 2 | 3 |SIGN|FIG.| R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | |Tail Unit (Fuselage Tail Section) | | | | | |
R | | |(Zones 310-320-330-340) | | | | | |
R | | | | | | | | |
R | A.| |Do a general visual inspection of: | X | | | | |
R | | |- the attachment areas of the | | | | | |
R | | | horizontal and vertical stabilizers, | | | | | |
R | | |- the APU air-intake areas of the tail | | | | | |
R | | | cone. | | | | | |
R | | |Horizontal stabilizer | | | | | |
R | | |(Ref. TASK 55-16-00-200-001) | | | | | |
R | | |Vertical stabilizer | | | | | |
R | | |(Ref. TASK 55-36-00-210-001) | | | | | |
R | | |APU intake (Ref. TASK 49-16-00-210-001)| | | | | |
R | | |If you find damage: | | | | | |
R | | |(1) Do a detailed visual inspection | | X | | | |
R | | | of the vertical stabilizer center | | | | | |
R | | | box (Ref. TASK 55-30-00-200-001) | | | | | |
R | | |(2) Do a visual inspection of the THS | | | | | |
R | | | sparbox | | | | | |
R | | | (Ref. TASK 55-10-00-210-001) | | | | | |
R | | |(3) Examine the hinges of the elevator | | X | | | |
R | | | and the rudder for cracks | | | | | |
R -------------------------------------------------------------------------------
R 1EFF : 051-054, 1 05-51-11Page 636 1 1 May 01/05 1 1 1CES 1
R **ON A/C 001-003, 051-054,
Subtask 05-51-11-210-067
T. Inspection of the Water System, Ram Air Turbine and APU (Ref. TASK 29-22-00-720-001)
-------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| |1. | |Water System (Zone 171) | | | | | | | | |Examine the tanks for correct | X | | | | | | | |attachment and signs of leakage | | | | | | | | | | | | | | | |2. | |Ram Air Turbine (Zone 195) | | | | | | | | |Examine the turbine for correct stowage| X | | | | | | | |If it is not latched: | | | | | | | | |(1) Examine all the installation. | | X | | | | | | |If you find damage: | | | | | | | | |(a) Do a functional test of the ram | | | X | | | | | | air turbine and system | | | | | | | | | (Ref. TASK 29-22-00-720-001) | | | | | | | | | | | | | | | |3. | |APU (Zones 313-314-315-316-317) | | | | | | | | |Do a general inspection of the APU | X | | | | | | | |compartment for leakage. | | | | | | | | |If you find damage: | | | | | | | | |(1) Examine the APU for correct | | X | | | | | | | installation. | | | | | | | | | Examine the mountings for damage, | | | | | | | | | distortion and signs of movement. | | | | | | | | |(2) Examine the container brackets and | | X | | | | | | | the container of the APU fire | | | | | | | | | extinguisher for: | | | | | | | | | - damage | | | | | | | | | - condition | | | | | | | | | - correct attachment and | | | | | | | | | installation. | | | | | | -------------------------------------------------------------------------------
R 1EFF : 001-003, 051-054, 1 05-51-11Page 637 1 1 May 01/05 1 1 1CES 1
Subtask 05-51-11-210-068
U. Cargo Compartments Inspection
-------------------------------------------------------------------------------|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.| | |CODE| | 1 | 2 | 3 |SIGN|FIG.| |----|----|---------------------------------------|-----|-----|-----|----|----| |1. | |Cargo Compartments | | | | | | | | |(Zones 131-132-151-152-161-162) | | | | | | | | | | | | | | | | A.| |Do a visual inspection of the cargo | X | | | | | | | |compartments for general condition | | | | | | | | |and damage. | | | | | | | | |If you find damage: | | | | | | | | |(1) Examine the loading and unloading | | X | | | | | | | systems of the containers/pallets | | | | | | | | | and examine the cargo restraint | | | | | | | | | system. In the forward and aft | | | | | | | | | cargo compartments, examine the | | | | | | | | | side guides, pallet locks and | | | | | | | | | rollers (ball units, roller | | | | | | | | | assemblies, drive units, guide | | | | | | | | | latches and tracks). | | | | | | | | | Make sure that they can move | | | | | | | | | freely. | | | | | | -------------------------------------------------------------------------------