• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2010-06-06 21:52来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

WET GALLEYS
The wet galleys are connected to :
- the water and waste system,
- the air extraction system,
- the main air cabin ventilation system,
- the electrical power system.
GALLEYS COOLING
At most galley locations, chilled air systems are used
to cool the meal trolleys.
The freon cooling system requires special servicing.
TMUESGP01-T02 LEVEL 1
EFFECTIVITY 25-30-00 Page 4
Sep 30/95
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 60
ALL
DRY / WET GALLEYS
TMUESGP01-P02 LEVEL 1
EFFECTIVITY 25-30-00 Page 5
Sep 30/95
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 61
ALL
THIS PAGE INTENTIONALLY LEFT BLANK
TMUESGP01 LEVEL 1
EFFECTIVITY 25-30-00 Page 6
Sep 30/95
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 62
ALL
25 - EQUIPMENT/FURNISHINGS
25-40-00 TYPICAL LAVATORY PRESENTATION
CONTENTS:
General
Lavatory
TMUESLP01 LEVEL 1
EFFECTIVITY 25-40-00 Page 1
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 63
ALL
TYPICAL LAVATORY PRESENTATION
GENERAL
Lavatories are normally installed at the forward and
aft sections of the cabin.
They are assembled as modular units and they are
attached at the top of the aircraft structure and at
the bottom to hard points in the cabin floor structure.
The position and the number of lavatories change with
the cabin configuration.
TMUESLP01-T01 LEVEL 1
EFFECTIVITY 25-40-00 Page 2
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 64
ALL
TMUESLP01-P01 LEVEL 1
TYPICAL LAVATORY PRESENTATION
EFFECTIVITY 25-40-00 Page 3
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 65
ALL
TYPICAL LAVATORY PRESENTATION
LAVATORY
All lavatories have the same equipment.
They are connected to the electrical power system, air
conditioning system and water/waste system.
In case of emergency all lavatories can be unlocked
from the outside.
TMUESLP01-T02 LEVEL 1
EFFECTIVITY 25-40-00 Page 4
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 66
ALL
TYPICAL LAVATORY PRESENTATION
TMUESLP01-P02 LEVEL 1
EFFECTIVITY 25-40-00 Page 5
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 67
ALL
THIS PAGE INTENTIONALLY LEFT BLANK
TMUESLP01 LEVEL 1
EFFECTIVITY 25-40-00 Page 6
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 68
ALL
25 - EQUIPMENT/FURNISHINGS
25-30-00 TYPICAL GALLEY INSTALLATION D/O
CONTENTS:
General
Lower Attachment
Upper Attachment
Interfaces
Safety Precautions
TMUESGD02 LEVEL 3
EFFECTIVITY 25-30-00 Page 1
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 69
ALL
TYPICAL GALLEY INSTALLATION D/O
GENERAL
Installation of any galley includes the adaptations
of the surrounding furnishings and the installation
of dummy metal windows behind lateral galleys where
necessary.
Galley equipment may contain:
- ovens,
- water heaters,
- hot jugs,
- hot cups,
- coffee makers,
- waste trolleys,
- containers.
TMUESGD02-T01 LEVEL 3
EFFECTIVITY 25-30-00 Page 2
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
UF94200
EFFECTIVITY Page 70
ALL
TMUESGD02-P01 LEVEL 3
TYPICAL GALLEY INSTALLATION D/O - GENERAL
EFFECTIVITY 25-30-00 Page 3
Jul 31/99
_A319/A320/A321 TECHNICAL TRAINING MANUAL
MECHANICS / ELECTRICS & AVIONICS COURSE 25 EQUIPMENT/FURNISHINGS
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:ATA 25 EQUIPMENT AND FURNISHINGS(9)