• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-01 11:19来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


1. General

A. There  are two lavatory service panels located at BS418 and BS1180. The area
adjacent to and aft of the lavatory service panel and the door are suscepti-ble to staining and corrosion due to leakage from the lavatory drain.

2. Corrosion Prevention

A. After servicing  the toilet tank, the lavatory service panel area should be
flushed with clean water.

B. Inspect lavatory service panel  and fuselage skin aft of panel for damaged
finish and corrosion annually.

C. For minor corrosion detected during the periodic inspections and to minimize
the downtime of the airplane between overhaul cycles, apply a corrosion
inhibiting compound per Volume 1, 20-60-00. Excess material should be wiped
off with a clean, dry rag after 30 minutes.

D. Where extensive  corrosion exists, remove corrosion per Structural Repair
Manual for lavatory service panel and Structural Repair Manual for fuselage
skin.

Volume 2-757

52-40-01

Page 1
OCT 01/00

CORROSION PREVENTION MANUAL
LAVATORY SERVICE PANELS


AFT SERVICE PANEL SHOWN FORWARD PANEL SIMILAR
DETAIL I
Lavatory Service Panels
Figure 1


Volume 2-757

52-40-01

Page 2
OCT 01/00

CORROSION PREVENTION MANUAL
FORWARD ACCESS DOOR


1.  General

A.  The forward access door has a corrosion protective finish that consists of
chemical finish (Alodine) on clad aluminum parts, anodize surface treatment
on non-clad aluminum parts, a coat of BMS 10-11, type I, primer and a coat
of BMS 10-11, type II, enamel. Faying surfaces of dissimilar metals and
parts attached to the door skin are fay sealed with BMS 5-95 sealant. All
areas of possible moisture accumulation are drained or filled with BMS 5125
leveling compound. The exterior surface of the door is unfinished during

production  unless otherwise  requested by the operator. 
B. Areas of possible corrosion  are the internal  structure of the door, connec-
tion points and mechanisms. 

C.  The door should be treated at the same time as the door opening.

2. Corrosion Prevention

A. Make periodic inspections as described in Volume 1, 20-20-00 to ensure that
the protective finishes provided during manufacture remain intact.

(1)Gain access to interior structure of the door.

(2)Clean  out drains and drain paths. Check condition of leveling compound
(Ref Component Maintenance Manual, 52-48-44).

(3)Check  that drain valve is free to open and close.


CAUTION:  EXCESSIVE TIGHTENING OF PLUNGER TYPE DRAIN VALVE WILL CAUSE VALVE
FLANGE TO CRACK OR BREAK.

(4) If required, remove plunger type drain valve from outside of door, clean
out obstructions and reinstall valve until flange contacts skin. Tighten
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 防腐手册 CORROSION PREVENTION MANUAL(18)