• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-25 08:29来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

FIGURE NO.  SUBJECT  GRID NO. 
21-21.  Wiring Connections for Heater Operation Test  1I24 
21-22.  Spark Plug Gap Adjustment Tool  1J3 
21-23.  Heater Hourmeter Installation  1J4 
24-1.  Lamp Bank load  1J24 
24-2.  Battery Box  1K2 
24-3.  Electrical Component Location (Lamar Model No. B-00392-1)  1K5 
24-4.  Lamar B-00392-1 Regulator Overvoltage Test Method  1K6 
25-1.  Seat Back Lock  1K13 
25-2  Lumbar Seat Bladder Installation  1K15 
25-3.  Artex 110 ELT  1K18 
25-4.  Artex ELT 110 Wiring Schematic  1K19 
27-1.  Rod End Bearing Installation  2B8 
27-2.  Control Cable Inspection Technique  2B9 
27-3.  Cable Wear Pattern  2B10 
27-4.  Internal Cable Wear  2B10 
27-5.  Pulley Wear Patterns  2B12 
27-6.  Control Column Assembly  2B19 
27-7.  Flex (Universal) Joint Assembly  2B21 
27-8.  Aileron Controls  2B23 
27-9.  Bellcrank Rigging Tool  2C1 
27-10.  Aileron Rigging  2C2 
27-11  Rudder Controls  2C7 
27-12.  Clamping Rudder Pedals  2C9 
27-13  Rudder Rigging Tool  2C9 
27-14.  Rudder Rigging  2C9 
27-15.  Rudder Travel Adjustments  2C10 
27-16.  Rudder Trim Controls  2C12 
27-17.  Rudder Pedal Assembly  2C15 
27-18.  Stabilator Controls  2C17 
27-19.  Stabilator Rigging  2C20 
27-20.  Stabilator Travel Adjustments  2C22 
27-21.  Methods of Securing Trim Cables  2C22 
27-22.  Stabilator Trim Controls  2D3 
27-22a.  S-Tec Manual Electric Trim Clutch Check & Adjustment  2D5 
27-23.  Wrapping Trim Barrels  2D7 
27-24.  Stabilator Trim Screw Adjustment  2D7 
27-25.  Flap Controls and Rigging  2D12 
27-26.  Flap Step Adjustment  2D14 
27-27.  Flap Rigging Tool  2D15 
28-1.  Fuel System Installation  2D23 
28-2.  Fuel Cell Installation  2E5 
28-3.  Locking Fuel Cap Assembly  2E9 

Introduction Page 15 Revised: December 6, 2002
THE NEW PIPER AIRCRAFT, INC.
PA-44-180
AIRPLANE MAINTENANCE MANUAL

LIST OF ILLUSTRATIONS (cont) 
FIGURE N0.  SUBJECT  GRID NO. 
28-4.  Fuel Filter Assembly  2E12 
28-5.  Fuel Selector Valve  2E13 
28-6.  Fuel Gauge  2E16 
28-7.  Fuel Pressure Gauge and Calibration  2E17 
29-1.  Schematic Diagram of Hydraulic System  2F3 
29-2.  Hydraulic Pump  2F9 
29-3.  Hydraulic Lines Installation  2F13 
30-1.  Pitot Heat  2F21 
32-1.  Main Gear Oleo Strut Assembly  2G17 
32-2.  Main Gear Service Tolerances  2G20 
32-3.  Main Gear Installation  2H2 
32-4.  Aligning Main Gear  2H7 
32-5.  Nose Gear Oleo Strut Assembly  2H12 
32-6.  Nose Gear Installation  2H14 
32-7.  Nose Gear Service Tolerances  2H16 
32-8.  Nose Gear Downlock and Eccentric Bushing Installation  2H22 
32-9.  Nose Gear Adjustment  2I2 
32-10.  Clamping Rudder Pedals in Neutral Position  2I3 
32-11.  Rudder Pedals at Neutral Angle  2I3 
32-12.  Mechanical Nose Gear Door Mechanism  2I5 
32-13.  Main Gear Actuating Cylinder  2I15 
32-14.  End Gland Locking Device (Main Gear)  2I15 
32-15.  Nose Gear Actuating Cylinder  2I18 
32-16.  Main Wheel Assembly  2I21 
32-17.  Nose Wheel Assemblies  2I22 
32-18.  Wheel Brake Assembly  2J2 
32-19.  Removal and Installation of Anchor Bolts  2J3 
32-20.  Brake Installation  2J5 
32-21.  Parking Brake Valve Assembly  2J6 
32-22.  Gar-Kenyon Brake Master Cylinder (17000)  2J8 
32-23.  Cleveland Brake Master Cylinder (10-30)  2J8 
32-24.  Toe Brake Installation  2J10 
32-25.  Nose Gear Limit Switches  2J11 
32-26.  Adjustment of Main Gear Down Limit and Squat Switches  2J12 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:西门诺尔飞机维护手册 simenole PA-44-180 AMM 1(69)