Introduction Page 13 Revised: February 28, 2002 
THE NEW PIPER AIRCRAFT, INC. 
PA-44-180 
AIRPLANE MAINTENANCE MANUAL
LIST OF ILLUSTRATIONS  
FIGURE NO.  SUBJECT  GRID NO.  
6-1.  Three View  1C22  
6-2.  Station References  1C23  
6-3.  Access Plates and Panels  1D2  
7-1.  Jacking  1D9  
8-1.  Leveling Airplane  1D15  
8-2.  Weighing  1D17  
11-1.  Exterior Placards and Markings  1E15  
11-2.  Interior Placards and Markings  1E17  
12-1.  Service Points  1F9  
12-2.  Lubrication Chart - Landing Gear, Main  1F22  
12-3.  Lubrication Chart - Landing Gear, Nose  1G2  
12-4.  Lubrication Chart - Control System, Part 1  1G4  
12-5.  Lubrication Chart - Control System, Part 2  1G6  
12-6.  Lubrication Chart - Power Plant and Propeller  1G8  
12-7.  Lubrication Chart - Cabin Door, Baggage Door and Seats  1G10  
20-1.  Torque Wrench Formula  1G17  
20-2.  Method of Installing Rod End Bearings  1G18  
20-3.  Cherrylock Rivet Removal  1G19  
20-4.  Identification of Aircraft Fluid Lines  1G21  
21-1.  Cabin Environmental System Installation  1H13  
21-2.  Heater and Combustion Air Blower Assembly  1H14  
21-3.  Diagrammatic Cutaway of Heater to Show Whirling Flame Action  1H15  
21-4.  Fuel Regulator and Shutoff Valve  1H16  
21-5.  Top View - Duct Switch  1H16  
21-6.  Intake Valve and Switches  1H17  
21-7.  Wiring Diagram (Heater)  1H21  
21-8.  Primary Power Circuit (Heater)  1H22  
21-9.  Starting Power Circuit (Heater)  1H23  
21-10.  Spark Plug Fixture (Heater)  1I1  
21-11.  Wiring - Test Setup (Heater)  1I1  
21-12.  Spark Plug Gap Adjustment (Heater)  1I2  
21-13.  Ignition Unit Assembly (Heater)  1I6  
21-14.  Test Setup for Fuel Regulator and Shutoff Valve (Heater)  1I9  
21-15.  Heater Fuel Pump  1I10  
21-16.  Suggested Design for Seal Plates, Plugs, and Caps for  
Combustion Tube leakage Test  1I14  
21-17.  Test Setup for Combustion Air Pressure Switch  1I14  
21-18.  Exploded View of Heater Assembly  1I19  
21-19.  Exploded View - Combustion Air Blower and Motor Assembly  1I22  
21-20.  Suggested Setup of Heater Operation Test  1I24 
Introduction Page 14 
Revised: February 28, 2002 
1A18 
THE NEW PIPER AIRCRAFT, INC. 
PA-44-180 
AIRPLANE MAINTENANCE MANUAL
LIST OF ILLUSTRATIONS (cont)  
FIGURE NO.  SUBJECT  GRID NO.  
21-21.  Wiring Connections for Heater Operation Test  1I24  
21-22.  Spark Plug Gap Adjustment Tool  1J3  
21-23.  Heater Hourmeter Installation  1J4  
24-1.  Lamp Bank load  1J24  
24-2.  Battery Box  1K2  
24-3.  Electrical Component Location (Lamar Model No. B-00392-1)  1K5  
24-4.  Lamar B-00392-1 Regulator Overvoltage Test Method  1K6  
25-1.  Seat Back Lock  1K13  
25-2  Lumbar Seat Bladder Installation  1K15  
25-3.  Artex 110 ELT  1K18  
25-4.  Artex ELT 110 Wiring Schematic  1K19  
27-1.  Rod End Bearing Installation  2B8  
27-2.  Control Cable Inspection Technique  2B9  
27-3.  Cable Wear Pattern  2B10  
27-4.  Internal Cable Wear  2B10  
27-5.  Pulley Wear Patterns  2B12  
27-6.  Control Column Assembly  2B19  
27-7.  Flex (Universal) Joint Assembly  2B21  
27-8.  Aileron Controls  2B23  
27-9.  Bellcrank Rigging Tool  2C1  
27-10.  Aileron Rigging  2C2  
27-11  Rudder Controls  2C7  
27-12.  Clamping Rudder Pedals  2C9  
27-13  Rudder Rigging Tool  2C9  
27-14.  Rudder Rigging  2C9  
27-15.  Rudder Travel Adjustments  2C10  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:西门诺尔飞机维护手册 simenole PA-44-180 AMM 1(5)