• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-31 23:52来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b)  
Cost of new equipment

 (c)  
Projected demand for aircraft to be weighed.


 S 912-006
 (3)  
If floor scales are available, use procedure (a). You can weigh the airplane faster with this procedure than with procedures in which jacks are necessary.

 S 912-005

 (4)  
Procedure (b) is better than the two procedures that use wing or body jack points because there is less chance of structural damage to the airplane through failure of a support jack or weigh cell.

 S 912-004

 (5)  
Procedure (b) is more economical and faster than procedures (c) or


 (d) because installation of oleo locks are not necessary.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 08-20-00
 ALL  ú ú 01 Page 201 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.


 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 LEVELING AND WEIGHING(4)