• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-30 23:26来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

2  Prepare to Remove Sliding Seals
A.  Remove center track strips (Sheet 1, Fig. 401). 
B.  Remove upper and lower gap panels on stabilizer. Panels 9119 and 9120 on left side and 9219 and 9220 on right side (Ref 12-31-81, Removal/Installation).
NOTE:  For better access, leading edge bullnose fairing (panels 9117 and 9217) may also be removed (Ref 12-31-81, Removal/Installation).
3  Remove Sliding Seal Plates
A.  To remove lower seal plate, move stabilizer to full up position. To remove upper seal plate, move stabilizer to full down position.
B.  Remove pins securing link assemblies to pedestal (Fig. 401).
C.  Pull out sliding seal plate.
D. Remove all hardware from seal plate. Retain link assembly and corner plates for reinstallation. 4 Install Replacement Sliding Seals
A.  Center the link assembly retained during removal onto replacement seal plate. Assure that tie bar lugs are clear of seal plate edges and edge margins will be satisfactory. Mark location of tie bar on seal plate with pencil for future index.
515 
Aug 15/78  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  53-31-31 Page 401 


H83797 H26736
Stabilizer to Body Front Spar Sliding Seal Installation  500 
53-31-31  Figure 401 (Sheet 1)  Feb 15/72 
Page 402 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


500  Stabilizer to Body Front Spar Sliding Seal Installation 
Feb 15/72  Figure 401 (Sheet 2)  53-31-31 
Page 403 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


B  Clean tracks and immediate area to remove debris.
C.  Temporarily pin the link assembly to pedestal. Do not install the cotter pins (Fig. 401).
D.  Wrap protective Mylar tape around end of track strip as shown in detail A, sheet 2, Fig. 401 to protect seal plate from damage during installation.
E.  Insert seal plate into tracks. Plate must be bent in reverse direction during installation to clear stabilizer (detail B).
F.  Position seal plate on link assembly using index mark per step A and lightly clamp seal plate to tie bar.
G.  Move seal plate fore or aft as required to obtain equal dimensions between etched line on seal plate and edges of track strip along full length of exposed track (sheet 1).
H.  Tape all track openings to prevent drilling chips from entering track.
CAUTION:  IF CHIPS ENTER TRACKS, TEFLON SEAL MAY BECOME DAMAGED.
I.  Tighten clamps. Back drill a minimum of two holes through holes in tie bar into seal plate. Install temporary Cleco fasteners in holes.
J.  Remove pins securing link assembly to pedestal.
K.  Remove seal plate with attached link assembly.
L.  Bench assemble (rivet) seal plate, link assembly, and corner plates using existing holes in tie bar for drilling locations.
M.  Insert seal assembly into tracks per step E.
CAUTION:  ASSURE THAT MYLAR TAPE OF STEP D IS STILL IN PLACE, PRIOR TO INSERTION.
N.  Slide seal up and down. Force to move seal should not exceed 20 pounds and the seal should move freely.
O.  Attach link assembly to pedestal with pins and markers. Install cotter pins.
P.  Install rub guide. Adjust and trim ends of rub guide as required to maintain 0.03 +0.01 inch clearance between each end of rub guide and track.
501 
53-31-31 Page 404  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  Nov 15/73 


Q.  On upper seal only, manually position leading edge of stabilizer full up. Check for clearance between uppermost rivet at corner plates and body structure. If rivet interferes, shave driven head to clear.
Restore Airplane to Normal
A.  Remove all protective tapes and covers. Clean up area.
B.  Install center track strips. (See figure 401.)
C.  Install upper and lower gap panels on stabilizer where applicable. Refer to 12-31-81, Stabilizer Access Panel - Removal/Installation.
501 
Nov 15/72  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  53-31-31 Page 405 


STRUCTURE ATTACHMENT FITTINGS – DESCRIPTION AND OPERATION
1. General
A.  This section describes the fittings on the fuselage used for the attachment of landing gear and doors.
2.  Landing Gear Attachment Fittings
A.  The nose landing gear attachment fittings are incorporated in the nose landing gear wheel well structure.
B.  The main landing gear attachment fittings included in the fuselage structure consist of the fittings to which the landing gear side struts and support beams are attached.  The upper member of the landing gear side struts connect to the fuselage at body stations 685 and 695. Each landing gear support beam is connected to the fuselage by means of a swinging link fittings. The lower end of this link is connected to the landing gear support beam and its upper end is connected to two fuselage fittings, one at station 695 and the other at station 706. See figure 1.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 机身 FUSELAGE(14)