- If necessary clean the grill(s) and the housing(s) with a vacuum cleaner.
- If necessary replace the air extraction filter(s) (Ref. AMM TASK 25-30-00-960-002).
(3) Hold a suitable sized piece of paper to the applicable air extraction inlet(s). The paper will stay in position at the air extraction inlet(s) by the air suction.
(4) Install the removed oven (Ref. AMM TASK 25-35-19-400-001) or steam-oven (Ref. AMM TASK 25-35-19-400-003).
一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一 EFF : ALL ∞∞25-35-00∞∞∞∞∞∞∞∞∞∞Page 215
May 01/05 CES (5) If the fault continues:
- Replace the applicable oven (Ref. AMM TASK 25-35-19-000-001) and (Ref. AMM TASK 25-35-19-400-001) or the applicable steam-oven (Ref. AMM TASK 25-35-19-000-003) and (Ref. AMM TASK 25-35-19-400-003).
B. Do the test given in Para. 3.A.
ESCAPE FACILITIES - CABIN - FAULT ISOLATION PROCEDURES
______________________________________________________
TASK 25-62-00-810-801
Fault in the Slide Bottle Pressure for the LH FWD Pax Door
1. Possible Causes
_______________
- ESCAPE SLIDE FWD L (7500MM)
- DEU-B (300RH1)
- wiring
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 23-73-00-740-003 BITE Test of the Cabin Intercommunication Data System (CIDS) through the PTP AMM 23-73-00-740-005 BITE Test of the Cabin Intercommunication Data System
(CIDS) through the CFDS
R AMM 23-73-00-740-010 Interface and Power-Up Test of the Cabin
R Intercommunication Data System (CIDS) via the CFDS AMM 23-73-47-000-001 Removal of the Decoder/Encoder Units (DEU) B 300RH AMM 23-73-47-400-001 Installation of the Decoder/Encoder Unit (DEU) B 300RH AMM 25-62-44-000-002 Removal of the Escape-Slide Pack-Assembly AMM 25-62-44-400-001 Installation of the Escape-Slide Pack-Assembly ASM 23-73/11 ASM 25-65/01
3. Fault Confirmation
__________________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
A. Test
(1) Do the BITE test of the CIDS through the programming and test panel (PTP) (Ref. AMM TASK 23-73-00-740-003), or through the centralized fault display system (CFDS) (Ref. AMM TASK 23-73-00-740-005).
R **ON A/C 401-499,
R A. Do the Interface and Power-Up Test of the Cabin Intercommunication Data R System (CIDS) via the CFDS (Ref. AMM TASK 23-73-00-740-010).
R **ON A/C ALL
4. Fault Isolation
_______________
A. If the test gives a different maintenance message:
- Do the trouble shooting procedure related to the maintenance message.
B. If the test gives the maintenance message SLIDE BOTTLE FWD L, or DEU-B 300RH1:
- make sure the gage needle of the inflation reservoir pressure-gage is positioned over the green cursor, or to the right of the green cursor.
NOTE : The green cursor of the pressure gage is temperature compensated,
____ and reacts to temperature changes faster than the gas expansion in the inflation reservoir. The green cursor moves independently of the gage needle, when a temperature change occurs.
(1) If the pressure indication is not correct:
- replace the ESCAPE SLIDE FWD L (7500MM), (Ref. AMM TASK 25-62-44-000-002) and (Ref. AMM TASK 25-62-44-400-001).
(2) If the pressure indication is correct:
- replace the DEU-B (300RH1), (Ref. AMM TASK 23-73-47-000-001) and (Ref. AMM TASK 23-73-47-400-001).
(3) If the fault continues:
- do a check and repair the wiring between the: DEU-B (300RH1) connector C/36 and the SLIDE BOTTLE PRESS SENSOR connector A/C (Ref. ASM 25-65/01) and (Ref. ASM 23-73/11).
C. Do the test as given in paragraph 3. A. to check the correct operation (no maintenance message is shown).
Fault in the Slide Bottle Pressure for the RH FWD Pax Door
1. Possible Causes
_______________
- ESCAPE SLIDE FWD R (7501MM)
- DEU-B (300RH1)
- wiring
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 23-73-00-740-003 BITE Test of the Cabin Intercommunication Data System (CIDS) through the PTP AMM 23-73-00-740-005 BITE Test of the Cabin Intercommunication Data System
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual EQUIPMENT/FURNISHINGS(21)