曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Single Engine Taxi .......................................................................NG-3
Battery Charging Using APU or External AC Power ....................NG-4
GIV QFE Operations ....................................................................NG-5
RNAV Approach Procedures........................................................NG-6
High Elevation Airport Operations ................................................NG-7
Cold Weather Altimeter Setting Procedures ..............................NG-10
Use of Rudder In Flight ..............................................................NG-11
Thrust Reverser Lockout............................................................NG-12
Engine Start - Manual Operation of Start Valve .........................NG-13
Operational Procedures With Cowl Anti-ice Valve Locked
Open...........................................................................................NG-19
Functional Checks
Battery Integrity Check .................................................................NH-1
Pressurization System Check ......................................................NH-2
Fuel System Check ......................................................................NH-3
Auxiliary Hydraulic Pump / Brake System Check.........................NH-4
Elevator Trim System Check........................................................NH-6
Ground Spoiler System Check .....................................................NH-7
Stall Warning / Stall Barrier System Check..................................NH-9
Supplemental Data
Guidelines for Application of SAE De-icing Fluid Mixtures.............NI-1
Holdover Times For SAE Type I De-icing Fluid Mixtures...............NI-2
Holdover Times For SAE Type II De-icing Fluid Mixtures..............NI-3
Holdover Times For SAE Type IV De-icing Fluid Mixtures.............NI-4
Engine Fuel Grades .......................................................................NI-9
Hydraulic Fluids ..............................................................................NI-9
Engine Fuel Additives...................................................................NI-10
Oil Grades: Engine / Starter / APU...............................................NI-11
Conversion Tables .......................................................................NI-12
Quick Reference Handbook
REVISION 8 NORMAL PROCEDURES
Oct 11/02 Page NA - 1
Cockpit Preflight Inspection AFM 2-01-10
1. Circuit Breakers – (Pilot / Copilot / Elec. Equip. Area) ........CHECK
2. Standby Attitude Indicator ...................................................CAGED
3. Emergency Power ....................................................ARM / CHECK
4. Standby Engine Instrument and Warning Panel ................... AUTO
5. ESS AC and DC Bus Switches.............................................. AUTO
6. Battery 1 and 2 Switches (Sys. Check: Pg. NH-1) ....ON (22 - 27V)
7. Emergency Power .................................................................... OFF
8. EPMP Power Monitor Switch... ESS (115V AC / 400 HZ / 22 - 27V)
9. Standby Engine Instrument and Warning Panel .................CHECK
10. Landing Gear Handle ...........................................................DOWN
11. Pressurization Controls ..........CHECK / OUTFLOW VALVE OPEN
NOTE: Check manual control of outflow valve on first flight of day.
12. Fuel Quantity .......................................................................CHECK
13. Flaps.....................SET (10° RECOMMENDED FOR PREFLIGHT)
14. Parking Brake.............................................................................ON
15. Brake Accumulator ..............................................................CHECK
16. Brake ECU (Brake-By-Wire) / Skid Control Box (HMAB).................
........................................................................CLEAR OF FAULTS
17. Battery 1 and 2 Switches.......................................................... OFF
END
Exterior Preflight Inspection AFM 2-01-20
1. Wheel Well Doors ................................................................. OPEN
2. Oxygen Quantity....................................CHECK / DOOR SECURE
(1800 psi, 1500 psi minimum at 70°F [21°C].)
3. Forward External BATT Switch / Access Door....... OFF / SECURE
(SN 1156 and subs.)
4. Pitot Covers......................................................................REMOVE
5. Radome...............................................................................CHECK
6. Hydraulic Lines ....................................................................CHECK
Quick Reference Handbook
NORMAL PROCEDURES REVISION 8
Page NA - 2 Oct 11/02
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
湾流4快速检查单QRH GULFSTREAM IV QUICK REFERENCE HANDBOOK 1(4)