• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 > 空客 >

时间:2011-11-21 11:38来源:蓝天飞行翻译 作者:航空

To view this page ensure that Adobe Flash Player version 9.0.124 or greater is installed.

曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 18 OLM FBW 2006
Smoke / Fumes Checklist Industry Workshop
Outcome
Latest Changes in the procedure
􀂃 The ENTIRE crew must be part of the solution.
􀂃 For Smoke/Fire/Fumes events: TIME IS CRITICAL.
􀂃 A SINGLE CHECKLIST template to address non-ECAM
events.
􀂃 SMOKE REMOVAL Checklist easily accessible.
􀂃 Use of LARGE FONT for legibility of checklist in smoke
environment.
􀂃 Definition of INITIAL STEPS:
– quick / simple / reversible
– to stop smoke recirculation, enable Crew Protection & Communication.
– not requiring analysis by the crew
– not making the situation worse or inhibit further assessment
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 19 OLM FBW 2006
􀂃 Application of SMOKE REMOVAL
􀀗 IF DENSE SMOKE replaced by if SMOKE / FUMES becomes
the GREATEST THREAT.
Smoke / Fumes Checklist Industry Workshop Outcome
Latest Changes in the procedure
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 20 OLM FBW 2006
􀂃Diversion initiation
􀀗 FCOM Vol 3
􀀗 QRH
Smoke / Fumes Checklist Industry Workshop Outcome
Latest Changes in the procedure
BE
« DIVERSION MINDED »
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 21 OLM FBW 2006
􀂃 “Immediate Landing”
􀀗 If situation UNMANAGEABLE
􀀗 May mean:
– Overweight landing
– Tail wind landing
– Off airport landing
Latest Changes in the procedure
Smoke / Fumes Checklist Industry Workshop Outcome
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 22 OLM FBW 2006
1
4 e-briefing
3 Latest Changes in the Procedure
2 Review of the Airbus Smoke Procedure
Introduction
Contents
4 Conclusion
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 23 OLM FBW 2006
e-briefing: Introduction
􀂃 Objectives of the e-briefing
􀀗To gather all the information available on a subject.
􀀗To take the benefit of audio and video
􀂃 Objectives of the FCTM
􀀗To ensure proper understanding of the design and procedures
􀀗To explain why and how to apply a procedure
􀀗To answer the most frequent questions
􀀗To avoid the most frequent errors
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Airbus Smoke Procedure Finalization(5)