To view this page ensure that Adobe Flash Player version
9.0.124 or greater is installed.
曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 18 OLM FBW 2006
Smoke / Fumes Checklist Industry Workshop
Outcome
Latest Changes in the procedure
The ENTIRE crew must be part of the solution.
For Smoke/Fire/Fumes events: TIME IS CRITICAL.
A SINGLE CHECKLIST template to address non-ECAM
events.
SMOKE REMOVAL Checklist easily accessible.
Use of LARGE FONT for legibility of checklist in smoke
environment.
Definition of INITIAL STEPS:
– quick / simple / reversible
– to stop smoke recirculation, enable Crew Protection & Communication.
– not requiring analysis by the crew
– not making the situation worse or inhibit further assessment
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 19 OLM FBW 2006
Application of SMOKE REMOVAL
IF DENSE SMOKE replaced by if SMOKE / FUMES becomes
the GREATEST THREAT.
Smoke / Fumes Checklist Industry Workshop Outcome
Latest Changes in the procedure
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 20 OLM FBW 2006
Diversion initiation
FCOM Vol 3
QRH
Smoke / Fumes Checklist Industry Workshop Outcome
Latest Changes in the procedure
BE
« DIVERSION MINDED »
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 21 OLM FBW 2006
“Immediate Landing”
If situation UNMANAGEABLE
May mean:
– Overweight landing
– Tail wind landing
– Off airport landing
Latest Changes in the procedure
Smoke / Fumes Checklist Industry Workshop Outcome
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 22 OLM FBW 2006
1
4 e-briefing
3 Latest Changes in the Procedure
2 Review of the Airbus Smoke Procedure
Introduction
Contents
4 Conclusion
© AIRBUS 2006 S.A.S. All rights reserved. Confidential and proprietary document.
Smoke Procedure Finalization 23 OLM FBW 2006
e-briefing: Introduction
Objectives of the e-briefing
To gather all the information available on a subject.
To take the benefit of audio and video
Objectives of the FCTM
To ensure proper understanding of the design and procedures
To explain why and how to apply a procedure
To answer the most frequent questions
To avoid the most frequent errors
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
Airbus Smoke Procedure Finalization(5)