Lesson 3: GNS 530/430 Dual Installation Introduction
Student:
Date:
Objective
To develop the student’s ability to properly manage an integrated dual-installa-tion of GNS 530/430 avionics stack in an IFR environment.
Elements
a GMA 340 audio panel operations
a GNS 530/430 configuration and operation
a GTX 330 operation and TIS data interpretation
a GDL 49 operation and WX data interpretation and its relation to flight planning
Schedule
a Pre-flight briefing and review of student’s preparations – 30 min
a Student practice – 2 hrs
a Post-flight critique – 30 min
a Assignment for further student review – 5 min
Equipment
a Airplane
a POH/AFM (appropriate Pilot’s Guide)
a Charts appropriate to flight
a Note-taking materials
Instructor’s actions
Preflight
a Explain objective
a Assign route of flight
a Assign approach types to be completed
a Assign required operations using TIS and WX data
a Describe typical operation flow
a Describe common errors
In-flight
a Coach student performance
Post-flight
a Critique
Student’s actions
a Ask questions regarding objective, elements and common errors
a Perform operations as directed
a Post-flight – ask pertinent questions
Completion standards
Student should be able to complete basic tasks using all available avionics tools to complete the flight and demonstrate function to instructor as requested.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Garmin GNS 530/430 Sample Training Syllabus and Flight Lessons for Use by Flight Schools & Flying Clubs(9)