Joint Operational Evaluation Board – Airbus A380-800
Report of the JOEB Cabin Crew Subgroup
Issue One
Appendix D – A380-800 Training Syllabus for the Evacuation Demonstration Test -JAR/FAR 25.803
Description of the A380-800 “baseline” Cabin Crew Training as determined by Airbus for the Full Scale Evacuation Demonstration (25.803).
In March 2006 Airbus conducted training for the cabin crew scheduled to participate in the A380-800 Full Scale Evacuation demonstration at the Airbus Training Centre in Toulouse.
The total time of the training was 14 hours spread over 3 days for logistical reasons. The theoretical part of the training took 8 hours and 10 minutes, and the practical part was performed within 5 hours and 50 minutes.
A written test was performed and successfully accomplished by all 41 trainees.
An aircraft visit was completed in Hamburg.
Representatives from the National Aviation Authorities were present during the entire training and aircraft visit.
Airbus training was conducted in agreement with Advisory Circular 25.803, entitled “Emergency Evacuation Demonstrations,” dated November 13, 1989, and with FAR Part 121 and JAR-OPS 1 for operational requirements. This training will be considered the “baseline” training against which all operators’ emergency training for cabin crew members, who will operate on the A380-800 aircraft, must be compared.
The Airbus training program was derived from the standard Airbus “A380-800 Type Training for cabin crew” to address only the topics that were relative for the A380-800 Full Scale Evacuation Demonstration. (Refer also to Appendix C.)
The evacuation actions and commands outlined in the training were typical of standard industry practice.
The topics were the following:
–
Aircraft & Cabin presentation
–
Doors & Slide/Rafts
–
Communications
–
Emergency equipment
–
Standard Operating Procedures
–
Emergency Procedures
–
Crowd Control
A380-800 Aircraft & Cabin presentation
During this session a general aircraft presentation was provided describing the aircraft characteristics, the layout and configuration of the cabin.
–
Description of the aircraft dimensions & performances
–
Description of the location and sill height of the doors
–
Description of the main deck and the upper deck cabin layout
–
Description of the location of the emergency equipment
–
Description, location and the operation of the cabin crew seats
–
Description of the stairs, passenger seats and stowages.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Joint Operational Evaluation Board Airbus A380-800 Report of the A380-800 Cabin Crew Subgroup(21)