AGAB
Validity : S / N 1 - 9999 Post-MOD. 151 06-30 Page 2
00 (EM) JUN 02
Inspection doors - Area 100
Figure 1
AGAB
Validity : S/ N 1 - 9999 Post-MOD. 151
06-30-o0 (EM) Page 3
JUN 02
With vapor cycle cooling system (Figure 1A)
Identification
No. DESCRIPTION AREA LOCATION
AND ACCESSIBLE ELEMENTS
111 Propeller cone Propeller attachment
Propeller pitch adjustment screw
121 Power plant upper cowling Power plant upper section Firewall upper FWD section Brake hydraulic fluid tank Oil cooler
Tachometer sensor
Lighting regulator
Battery relay
Starter relay
Ground power relay
Oil pressure transmitter Oil pressure switch
122 Inspection door Oil gage
123 Inspection door Deicing fluid tank (if installed)
131 Power plant lower cowling Power plant lower section
Power plant rear table
Firewall lower FWD section
Engine air inlet
Exhaust pipe and heat exchanger Injection unit
Power plant fuel system
Power plant oil system
Propeller governor
133 Inspection door (if installed) Engine quick drain
134 Inspection door Compressor
With OPTION H882 (Figure 1B)
Identification
No. DESCRIPTION AREA LOCATION
AND ACCESSIBLE ELEMENTS
111 Propeller cone Propeller attachment
Propeller pitch adjustment screw
121 Power plant upper cowling Power plant upper section Firewall upper FWD section Brake hydraulic fluid tank Oil cooler
Tachometer sensor
122 Inspection door Oil gage
123 Inspection door Deicing fluid tank (if installed)
131 Power plant lower cowling Power plant lower section
Power plant rear table
Firewall lower FWD section
Engine air inlet
Exhaust pipe and heat exchanger Injection unit
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB 20 MAINTENANCE MANUAL 06 06 DIMENSIONS AND AREAS TB20飞机维护手册 06 尺寸和区域(13)