• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-15 08:36来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (c)
Install the fasteners.

 (d)
Do a resistance check again.


 S 344-016
 (16) Apply sealant to the clearance between the fin tip and fin (Ref 51-31-01/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 55-30-02
 ALL  ú ú 01 Page 405 ú Oct 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 DORSAL FIN - REMOVAL/INSTALLATION
_________________________________
 1.  General
_______
 A.  This procedure contains two tasks. The first task is the removal of the dorsal fin for the vertical stabilizer. The second task is the installation of the dorsal fin for the vertical stabilizer.
 TASK 55-30-03-004-001
 2.  Remove the Dorsal Fin (Fig. 401)
_____________________
 A.  References
 (1)  IPC 53-51-34 Fig. 1
 B.  Access
 (1)  Location Zone
 321 Vertical Stabilizer

 C.  Procedure
 S 024-016
 WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE AWAY FROM THE AREA
_______ BELOW THE DORSAL FIN. INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR IF THE EQUIPMENT FALLS.
 (1)
Remove the fasteners that attach the dorsal fin to the fuselage.

 S 014-024

 (2)  
Move the dorsal fin forward sufficiently for an access to the bonding jumper, approximately 5 to 6 inches.


 NOTE: The bonding jumper is on the aft side of the dorsal fin
____
 (Fig. 401).

 S 034-018
 (3)  
Disconnect the bonding jumper from the dorsal fin rib.

 (4)  
Remove the dorsal fin.


 S 034-019
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 55-30-03
 ALL  ú ú 01 Page 401 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


0.09 |0.03
INCH A-A
Dorsal Fin Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú


 55-30-03
 ALL  ú ú 01 Page 402 ú Jun 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 TASK 55-30-03-404-003
 3. Install the Dorsal Fin (Fig. 401)
______________________
 A. Standard Tools and Equipment
 (1)  
Meter - Bonding

 (2)  
C00064 Alodine - 1000 (Clear)

 (3)  
C00259 Enamel - Primer, Green, BMS 10-11

 (4)  
G00381 Paper - Abrasive, Aluminum Oxide, 180-grit


 B. References
 (1)  
20-22-01/601, Electrical Bonding

 (2)  
51-21-04/701, Alodized Surfaces

 (3)  
IPC 53-51-34 Fig. 1


 C. Access
 (1)  Location Zone
 321 Vertical Stabilizer

 D. Procedure
 S 424-006
 (1)  
Put the dorsal fin in the correct position on the fuselage without the weather seal around the bottom.

 S 354-007

 (2)
If you install a new dorsal fin, do the steps that follow:


 (a)  Cut the lower edge of the dorsal fin skin.
 NOTE: Make sure you have the correct clearance between the
____ lower edge of the dorsal fin and the fuselage (Fig. 401).
 (b)  
Break the sharp edges of the trimmed skin.

 (c)  
Apply a layer of clear Alodine (Ref 51-21-04/701).


 S 824-020
 (3)  Adjust the shim laminations to get the correct clearance between the bottom of the dorsal fin and the fuselage (View A-A, Fig. 401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 安定门 STABILIZERS(25)