• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-31 08:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

(1)  Remove following pressure ratio bleed control tubes from engine:
(a)  
Prior to P&WA SB 5425: 1) Bleed control high pressure air supply tube (Ps4). 2) Bleed control high pressure air sensing tube (Ps4). 3) Bleed control low pressure air supply tube (Ps3). 4) Bleed control low pressure air sensing tube (Pt2).

(b)  
Incorporating P&WA SB 5425: 1) Bleed control Ps4 manifold. 2) Bleed control high pressure air sensing tube (Ps4). 3) Bleed control low pressure air supply tube (Ps3). 4) Bleed control low pressure air sensing tube (Pt2). 5) Bleed control Ps4 tube (to start bleed control valve).


B.  Installation (Fig. 401, 402, 403)
(1)  Using new packings and/or retainers as indicated, install following pressure ratio bleed control tubes:
(a)  Prior to P&WA SB 5425: 1) Bleed control high pressure air supply tube connecting at top of engine to de-icing manifold and to bleed control. 2) Bleed control high pressure air sensing tube connecting at pad (2 o'clock position) on diffuser outer duct and to bleed control.
3)  Bleed control low pressure air supply tube connecting to bleed control, using two new packings and two retainers. Connect other end of tube to strainer housing (at 10 o'clock position) on diffuser outer duct.
4)  Bleed control low pressure air sensing tube, using two new packings and two retainers. Connect other end of tube to compressor inlet case (5 o'clock position).
5) Tighten nuts to recommended torque and lockwire. 6) Install clips and brackets on tubes.
(b)  Incorporating P&WA SB 5425: 1) Bleed control Ps4 manifold, between de-icing air manifold and bleed control. Connect Ps4 tube leading to start bleed control valve to manifold.
2)  Bleed control high pressure air sensing tube between diffuser outer duct pad (2 o'clock position) and bleed control.

500 
Oct 20/83  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  75-31-11 Page 401 


1.
Bleed Control High Pressure Air Sensing Tube

2.
Bleed Control High Pressure Air Supply Tube

3.
Bleed Control Low Pressure Air Sensing Tube

4.
Fuel Control Rear Ps4 Tube

5.
Bleed Control Low Pressure Air Supply Tube

6.
Pressure Ratio Bleed Control


Pressure Ratio Bleed Control and Tubing (Early Engines)  500 
75-31-11  Figure 401 (Sheet 1)  Oct 20/83 
Page 402 
BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details. 


500  Pressure Ratio Bleed Control 
Oct 20/83  and Tubing (Prior to SB 5425)      Figure 401 (Sheet 2) BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  75-31-11Page 403 


Pressure Ratio Bleed Control  500 
75-31-11 Page 404  and Tubing (Incorporating SB 5425) Figure 401 (Sheet 3) BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  Oct 20/83 

 

3)  Bleed control low pressure air supply tube, using two new packings and retainers. Connect other end of tube to strainer housing (at 10 o'clock position) on diffuser outer duct.
4)  Bleed control low pressure air sensing tube, using two new packings and retainers. Connect other end of tube to compressor inlet case (5 o'clock position).
3.  Removal/Installation of the Pressure Ratio Bleed Control
A.  Removal
(1)  
Disconnect pressure ratio bleed control tubes at control (see step 2.a.).

(2)  
Unfasten bolts (formerly locknuts) and remove pressure ratio bleed control from lower right side of engine.


B.  Installation
(1)  
Place pressure ratio bleed control on diffuser outer duct (5 o'clock position).

(2)  
Secure assembly with four washers and bolts. Torque bolts.

NOTE: Use washers and locknuts for stud type installations.

(3)  
Reconnect bleed control tubing and secure (see step 2.B.).


500 
Oct 20/83  BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  75-31-11 Page 405 


H27063
Pressure Ratio Bleed Control Tube Installation  500 
75-31-11Page 406   Figure 402 BOEING PROPRIETARY - Copyright . - Unpublished Work - See title page for details.  May 01/99 


PRESSURE RATIO BLEED CONTROL METERING PLUG-REMOVAL/INSTALLATION
1.  General
A.  The procedure in this section pertains to the removal and installation of the pressure ratio bleed control metering plug located approximately 4 O'clock on the right side of engine.
2.  Equipment and Material
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737 AMM 飞机维护手册 点火 空气 AIR(14)