• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2010-10-23 10:16来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

VAPP
before extending the landing gear to enable the aircraft to be trimmed for approach.
Disregard
″USE MAN PITCH TRIM″ on the PFD, because the stabilizer is frozen in the position
where it
was at, when the windmilling was insufficient to provide hydraulic power.
 When L/G downlocked
L/G
lever..........................................................................................................................DO
WN
APPROACH SPEED.....................................................................................................
ADJUST
Adjust the speed to the determined Vapp. Nevertheless, to reach the landing
field/runway, the
approach speed may be adjusted up to 215 kt (max speed with slats extended).
GND
SPLR...............................................................................................................................
ARM
MAX BRK
PR..................................................................................................................... 1000 PSI
AT 2 000 FT AGL
CABIN................................................................................................................NOTIF
Y FOR LANDING
AT 500 FT AGL
BRACE FOR
IMPACT.................................................................................................................ORD
ER
AT TOUCHDOWN
ENG
MASTERS.......................................................................................................................
........ OFF
BRAKES ON ACCU ONLY
AFTER LANDING
 When the aircraft has stopped :
PARKING
BRK............................................................................................................................
ON
ATC.................................................................................................................................
.... NOTIFY
 If Evacuation required :
EVACUATION...............................................................................................................
INITIATE
ELT  ....................................................................................................... CHECK
EMITTING
If not, switch on the transmitter
 If Evacuation not required :
CABIN CREW and PASSENGERS
(PA).......................................................................NOTIFY
To be continued on next page
ABN-70
7/10
AQU3I1CK8 R/AEF3E1RE9N/ACE3 H2A0ND/A B3O2OK1
ABNORMAL AND
EMERGENCY PROCEDURES 30 AUG 10
A318/A319/A320/A321 FLEET MSN
ENG DUAL FAILURE - NO FUEL REMAINING - SECURE CABIN AND
COCKPIT (Cont'd)
IF DITCHING ANTICIPATED
APPROACH
FOR
LDG............................................................................................................................US
E FLAP 3
Only slats extend, and slowly.
MIN APPR
SPEED.......................................................................................................................160
KT
VAPP...............................................................................................................................
.. DETERMINE
Vapp is the maximum between VREF + 30 kt/160 kt:
Weight (1 000 kg) 52 56 60 64 68 72 76 80 84 86
Vapp 160 160 160 160 163 167 171 174 178 180
 At a suitable altitude (not below 3 000 ft AGL), configure the aircraft for
ditching (CONF 3 ;
L/G UP)
L/G
lever..........................................................................................................................CHE
CK UP
AT 2 000 FT AGL
CABIN.............................................................................................................. NOTIFY
FOR DITCHING
DITCHING
pushbutton......................................................................................................................
ON
In case of strong crosswind, ditch face to the wind.
In the absence of strong crosswind, prefer ditching parallel to the swell. Touchdown
with
approximately 11 ° of pitch and minimum aircraft vertical speed.
AT 500 FT AGL
BRACE FOR
IMPACT.................................................................................................................ORD
ER
AT TOUCHDOWN
ENG
MASTERS.......................................................................................................................
........ OFF
AFTER DITCHING
ATC (VHF
1).............................................................................................................................
NOTIFY
EVACUATION................................................................................................................
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:空客320快速检查单QRH QUICK REFERENCE HAND BOOK4(100)