• 热门标签
时间:2010-10-21 12:31来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

□(4)Change organization structure or name
□(5)Others
5. Maintenance functions applied for
□Airframe □Powerplant
□Propeller □Components
□Specialized service □Others
6. Accountable Manager
Name Title
Signature Date
AC-145-2 - 11 -
Application Guide for Foreign/Regional Maintenance Organization Certificate
7. Detail maintenance functions applied for and facilities location
8. Maintenance functions contracted to outside agencies
- 12 -
AC-145-2
Application Guide for Foreign/Regional Maintenance Organization Certificate
Attachment 2(total 4 pages)
Company
Maintenance capability list
CAAC Certificate No.
Revision No.
Revision date:
Organization address: .
AC-145-2 - 13 -
Application Guide for Foreign/Regional Maintenance Organization Certificate
Company maintenance capability list
Effective page list
CAAC Certificate No.: Revision No:
Page
Revision Date
Item quantity
Notes
Maintenance capability list statement
------------------------
Approved by:
Approve Date:
- 14 -
AC-145-2
Application Guide for Foreign/Regional Maintenance Organization Certificate
AC-145-2 - 15 -
Statement on Maintenance Capability List
It certifies that all items listed in this maintenance capability list are within the approved scope of maintenance organization certificate issued by CAAC (certificate No.________). It is guaranteed that the maintenance organization is qualified for housing & facility, tools & equipment, materials, airworthiness documentation and personnel listed in the maintenance capability list, has the working instruction as CCAR-145 requested in place and meets CCAR-145 requirements constantly.
Any change and revision of this maintenance capability list has to be reported to CAAC for approval.
Name: (printed)
Signature: (signature)
Date:
(this statement shall be signed by the accountable manager or the quality manager authorized by him )
Application Guide for Foreign/Regional Maintenance Organization Certificate
××××company maintenance capability list
××××year××month××day
S/N
P/N
Name
ATA
Chapter No.
Manufacturer
Maintenance working rating
Basis documentation
Main Equipment
Notes
Notes:
1. Maintenance organization could work out its own maintenance capability list based on above format, but the items must be within the approved scope of maintenance organization certificate.
2. Paper size used for maintenance capability list shall be A4 or similar one; if the list runs lots of pages, effective page list shall be used to control the validity.
3. The sequence number is running number and the tactic sequence if these items shall follow ATA chapter order.
4. If the basis documentation and mainly used equipment for parts with same P/N but different tail numbers are the same, it does not have to list these tail numbers separately.
5. Maintenance work items shall be any one or combination of testing, repairing, alteration, modification and overhaul. However the word overhaul cannot be used for non-lifetime control parts and those without basis documentation.
6. Basis documentation shall be airworthiness material and technical documentation offered by aircraft parts manufacturer.
7. The main equipment shall be final testing equipment in general.
- 16 - AC-145-2


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Application Guide for Foreign Regional Maintenance Organizat(5)