曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
A: right
B:wrong
360 题目: In conducting Land and Hold Short Operations (LAHSO), the pilot should
have readi ly avai lable:
A: The publ ished Avai lable Landing Distance (ALD), landing performance of the
B: The publ ished runway length and slope for al l LAHSO combinations at the
C: The landing performance of the aircraft, publ ished Avai lable Landing Distance
(ALD) for al l LAHSO combinations at the airport of intended landing, plus the
forecast winds.
361 题目: the purpose of dilating ethylene glycol deicing fluid with water in
non-precipitation condition is to
A: Varies the eutectic point
B: Increase the minimum freezing point (outset of on stal lzation)
C: Decrease the freeze point
362 题目: If the cruising speed of an aircraft is 420 nautical mi les, pi lot should f ill
in the CRUISING SPEED block with
A: 420N.
B: N420.
C: N0420.
363 题目:When an ATC control ler assigns a too low speed for the aircraft‘s
operating l imitation under the existing circumstance, what should the pi lot do?
A: reduce speed to the assigned speed.
B: reduce speed to the minimum speed at that circumstance.
C: advise ATC of the speed that wi l l be used.
364 题目: (Refer to Figure 6-1) During the VOR/DME Rwy 36R approach whi le
maintaining an on gl ide slope indication with a groundspeed of 140 knots, what
was the appropriate rate of descent?
A: 632 feet per minute.
B: 843 feet per minute.
C: 737 feet per minute.
365 题目:Which is a disadvantage of the one-step over the two-step process when
deicing/anti-icing an airplane?
A: It is more compl icated.
B: The holding time is increased.
C:More f luid is used with the one-step method when large deposits of ice and snow
must be f lushed of f airplane surfaces.
366 题目:Which is a def inition of the term "f l ight crewmember"?
A: a pilot, f light engineer, or f light navigator assigned to duty in the aircraft
during f l ight time.
B: Any person assigned to perform duty in an aircraft during f l ight time.
C: Any person assigned to duty in an aircraft during f l ight except a pi lot or fl ight
engineer.
367 题目: During an en route descent in a f ixed-thrust and f ixed-pitch attitude
conf iguration, both the ram air input and drain hole of the pi lot system become
completely blocked by ice. What airspeed indication can be expected?
A: Increase in indicated airspeed
B: Decrease in indicated airspeed
C: Indicated airspeed remains at the value prior to icing
368 题目: the water vapor held in unsaturated air is
A: Invisible always
B: Visible always
C: Visible only i f temperature is low enough
369 题目: CAT turbulance most l ikely encountered
A: constant pressure chart show 20 kt less than 60 NM apar
B: constant pressure chart show 20 kt less than 60 kt apar
C: constant pressure chart show 20 kt less than 20 kt
370 题目: A person whose duties include the handing or carriage of dangerous
articles and/or magnetized materials must have satisfactori ly completed an
establ ished and approved training program within the preceding
A: 6 calendar months.
B: 12 calendar months.
C: 24 calendar months.
371 题目: An ATC ”instruction”
42
A:must be read back in full to the control ler and conf irmed before becoming
B: is a directive issued by ATC for the purpose of requiring a pi lot to take
C: is the same as an ATC clearance.
372 题目: (Refer to Figure 6-2) How can the FAF on the ILS/DME Rwy 36L of
CAPITAL be identif ied?
A: 16.5KM from ILG.
B: 16.5NM from ILG.
C: 16.5SM from ILG.
373 题目:Whi le being vectored to the f inal approach course of an IFR approach,
when may the pi lot descend to publ ished altitudes?
A: Anytime the f light is on a publ ished leg of an approach chart.
B:When the f light is within the 10-mi le ring of a publ ished approach.
C: Only when approach control clears the f light for the approach.
374 题目: A domestic air carrier f light has a delay while on the ground, at an
intermediate airport. How long before a redispatch release is required?
A: Not more than 1 hour.
B: Not more than 2 hours.
C:More than 6 hours.
375 题目: Which take-of f climb segment is the most critical?
A: 1st
B: 3rd
C: 2nd
376 题目: The relative humidity wil l be 100% when
A: Dew point< bulb>
B: wet bulb and dry bulb =
C: Dew point>dry bulb
377 题目:What altitude is a pi lot authorized to f ly when cleared for an ILS approach?
The pi lot
A:may begin a descent to the procedure turn altitude.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航线资料1294题(87)