 Generic Description Failure of communications link between the ground station and the automated ground system. This will cause a loss of ADS B data.
Hazard Cause/Initiating Events Loss of ADS-B positional data to the controller. Increase in workload due to transitioning period back to procedural  control and reassess traffic.
  Initial Risk  Residual 
Risk 
  Likelihood  Occasional  Remote 
  Consequence  Cat 3  Cat 3 
  Risk  C  D 
Existing Mitigation 

Safety Requirement Details  
Transition Process for  Training and lesson plans to adequately   ADS-B Failure cover the transition process and procedures    from ADS-B control to procedural control
Adequate RMA  Ensure adequate RMA (reliability, maintainability, availability) requirement is   requirements for  specified for the communications systems  comms system (e.g. links, PSN, modems,etc) between   the ground station and the ATM centre.   Need to provide an alternate path if the   third party link service provider cannot meet   RMA requirements.
ADS-B Fallback  Validated and published instructions   procedure for reverting back to procedural control 
Monitoring of Comms  Ensure monitoring is provided for all   equipment communications equipment used in ADS B  
Project   ICAO SASPOperational Use of ADS-B in Non Radar Airspace
Hazard No. 29 Unstable sensitivity of ground sensor
Generic Description
Unstable sensitivity of the ground sensor will cause tracks dropping in and out of coverage in the control area.

Hazard Cause/Initiating Events
Loss of ADS-B positional data to the controller. Increase in workload due to transitioning period back to procedural 
control and reassess traffic.

  Initial Risk  Residual 
Risk 
  Likelihood  Occasional  Remote 
  Consequence  Cat 3  Cat 3 
  Risk  C  D 
Existing Mitigation 

Safety Requirement Details 
ADS-B Fallback  Validated and published instructions   procedure for reverting back to procedural control 
Transition Process for  Training and lesson plans to adequately   ADS-B Failure cover the transition process and procedures    from ADS-B control to procedural control
Tuning of receiver  Ensure the receiver is properly tuned during   sensitivity setup and testing to provide stable sensitivity.
Project       ICAO SASPOperational Use of ADS-B in Non Radar Airspace

Hazard No. 30 Failure of Site Monitor
Generic Description Site Monitor failure will render the ADS B data not acceptable for separation however could still be used for situation  awareness
Hazard Cause/Initiating Events Indicate the potential loss of ADS B data
  Initial Risk  Residual 
Risk 
  Likelihood  Occasional  Occasional 
  Consequence  Cat 3  Cat 4 
  Risk  C  D 
Existing Mitigation Controller observes tracks with respect to reference data (e.g. maps, radar returns, etc) 


Safety Requirement Details 
Coverage of Site  Ensure ATC training and procedures cover   Monitor failure in ATC the the scenario of Site Monitor failure    training
Warning for Site  Ensure a warning is sent to ATC when the   Monitor failure ADS B site monitor is faulty or unavailable.
 
Project ICAO SASPOperational Use of ADS-B in Non Radar Airspace

Hazard No. 31 Incorrect 24 bit code in the Flight Plan
 