• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 > ICAO >

时间:2011-08-28 15:13来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

ADS-B avionics  ADS-B broadcast rate of 1 sec from the   broadcast rate aircraft
Transition Process for  Training and lesson plans to adequately   ADS-B Failure cover the transition process and procedures    from ADS-B control to procedural control
ADS-B Fallback  Validated and published instructions   procedure for reverting back to procedural control 
ADS-B tracks update  ADS-B tracks updated rate of every 5 secs  rate
Project ICAO SASPOperational Use of ADS-B in Non Radar Airspace

Hazard No. 10 RF Jamming
Generic Description
RF jamming of ADS-B transmissions due to deliberate or non deliberate actions.

Hazard Cause/Initiating Events
Loss of ADS-B positional data to the controller. Increase in workload due to requirement to transition back to
procedural 
control

  Initial Risk  Residual 
Risk 
  Likelihood  Improbable  Improbable 
  Consequence  Cat 3  Cat 3 
  Risk  D  D 
Existing Mitigation 

Safety Requirement Details 
ADS-B Fallback  Validated and published instructions    procedure for reverting back to procedural control 
Transition Process for  Training and lesson plans to adequately   ADS-B Failure cover the transition process and procedures    from ADS-B control to procedural control
Project ICAO SASPOperational Use of ADS-B in Non Radar Airspace
Hazard No. 11 Jamming of GPS transmissions from the satellites
Generic Description
Jamming of GPS transmissions from the satelites due to deliberate or non deliberate actions.

Hazard Cause/Initiating Events
Loss of ADS-B positional data to the controller. Increase in workload due to requirement to transition back to
procedural 
control

  Initial Risk  Residual 
Risk 
  Likelihood  Remote  Remote 
  Consequence  Cat 3  Cat 3 
  Risk  D  D 
Existing Mitigation 

Safety Requirement Details 
Remove ADS-B tracks  When downlink positional data is reduced   for poor positional  below NUC = VSP (Variable System   Parameter - typically 5),  ADS-B tracks will   be removed within 30 secs
On-line integrity  A site monitoring system shall provide a   monitoring using site  degree of on-line integrity monitoring. A  monitor warning shall be issued to ATC if the site   monitor is not received or indicates a low   NuC value
ADS-B Fallback  Validated and published instructions   procedure for reverting back to procedural control 
Transition Process for  Training and lesson plans to adequately   ADS-B Failure cover the transition process and procedures    from ADS-B control to procedural control
Processing based on  Automation system to detect the reduction   accuracy performance in accuracy performance and not used that   data if it is below the threshold of NUC =   VSP (Variable System Parameter- typically   5) and display appropriate visual notification   to the controller concerned.
Project ICAO SASPOperational Use of ADS-B in Non Radar Airspace
Hazard No. 12 Failure of GPS satellite or satellites
Generic Description
Failure of GPS satellite or satellites due to system problem.

Hazard Cause/Initiating Events
Loss of ADS-B positional data to the controller. Output NUC drops and ADS-B not displayed to controller. Increase
in 
workload due to requirement to transition back to procedural control
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Operational Use of ADS-B In Non Radar Airspace Generic Desig(17)