3.
Building Permit. Applicant is responsible for obtaining a building permit from the City of Spearfish and is solely responsible for the cost thereof. Applicant shall submit a copy of the building permit as part of the Development Plan.
4.
Applicant shall submit a building design plan endorsed with an engineer’s certificate of design, including building dimensions, building materials (to include doors and windows) and color, and specifications for any other improvements, e.g. ramp construction leading to the hangar.
5.
A timeline of construction shall also be provided indicating dates of commencement of project and anticipated date of completion.
6.
The applicant’s contact information and that of the builder shall be provided.
7.
Applicant shall have entered into a lease agreement with the Sponsor prior to commencement of any construction or dirt work.
B. Building Design and Materials Requirements:
1.
Buildings or alterations to existing to buildings must conform to the applicable building codes and building set-backs then in effect
2.
Applicant is also expected to follow all applicable regulations contained in the Black Hills Airport Rules and Regulations and Minimum Standards.
3.
Basic construction shall be a metal covered commercial-type building.
a.
Framing. All framing shall be of metal or dimensioned lumber, or pole type meeting applicable building code regulations.
b.
Foundations. Design and construction shall meet all applicable building code regulations.
c.
Exterior Walls. Exterior finish shall be high-rib metal panel, using a minimum 26 gauge steel with a permanent maintenance free coating. Exterior color shall be either white or earth-tone color. Earth tone color must be approved as part of the Development Plan process. All hangars in a hangar row shall be of the same color unless otherwise approved by the Sponsor. No wood exterior finish, including door and window framing is allowed. Exterior walls shall be a minimum of 14 feet high.
d. Roof. Metal buildings shall be constructed with a high-rib
panel metal roof with a maximum 4:12 pitch. No flat or barrel
roofs are allowed. All hangars in a hangar row shall have the
same roof pitch unless otherwise approved by the Airport
Board.
e. Floor. Hangar floor shall be reinforced concrete and meet
applicable building codes then in effect. Floor elevation shall
be verified with Airport engineer prior to construction.
Applicant is responsible for any cost associated with
engineering services.
f. Doors. All hangars shall have an engineered bi-fold, hydraulic
type, or vertical bi-fold door or similar door that does not
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:RULES AND REGULATIONS FOR BLACK HILLS AIRPORT/CLYDE ICE FIELD(10)