• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 > 空客 >

时间:2011-08-25 18:16来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

7.1.4 Navigation Database control ...............................................................39

7.1.5 TAWS terrain database and flight path adequacy ................................40

7.2. RNP AR (SAAAR) operational procedures ............................................40

7.2.1 Flight preparation ................................................................................40

7.2.1.1 Required Equipment ............................................................................40

7.2.1.2 GPS PRIMARY availability....................................................................41

7.2.2 RNP AR Departure ...............................................................................41

7.2.2.1 Cockpit preparation .............................................................................41

7.2.2.2 Before takeoff .....................................................................................42

7.2.2.3 Takeoff and climb out..........................................................................42

7.2.3 Lateral and vertical deviation monitoring............................................42

7.2.4 RNP AR Approach and Missed Approach ..............................................44

7.2.4.1 Approach preparation..........................................................................44

7.2.4.2 Flying the approach.............................................................................45

7.2.4.3 Missed Approach procedure ................................................................46

7.2.5 Abnormal procedures ..........................................................................46

7.2.5.1 Engine failure ......................................................................................47

7.2.5.2 Navigation and guidance system failure..............................................47

7.2.6 RNP Monitoring Program.....................................................................48

7.2.7 Maintenance........................................................................................48

7.3 Flight Crew and Dispatcher Training....................................................49

7.3.1 Flight crew recurrent training .............................................................50

8 Operational approval ................................................................................... 51

8.2 Airbus operational support..................................................................53

8.3 Airbus deliverable ...............................................................................53

9 List of abbreviations..................................................................................... 54

1. Introduction
Getting to grips with RNP AR


1. INTRODUCTION
The Performance Based Navigation concept allows to optimize the instrument procedure
design with the aircraft navigation performance.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:getting to grips with RNP AR Required Navigation Performance(3)