C I R R U S SR22
Service Bulletin
SB 2X-30-03 R1
Cirrus Design SR22 Serials 3003, 3310, 3326, 3403 Page 1
thru 3424, 3463, and 3499 w/ FIKI ice protection system.
EFFECTIVITY:
Number: SB 2X-30-03 R1
1. COMPLIANCE
Recommended: Accomplish this Service Bulletin prior to flight into known ice or within the next 12 calendar
months, whichever occurs first. Compliance time begins upon receipt of this Service Bulletin.
This Service Bulletin has been revised to:
• correct the Effectivity Information,
• correct indicated purge pressure psi values,
• correct specifications in tools, equipment, and supplies table, and
• clarify instructions for retention of Ground Flow Test results.
Operators who have successfully complied with the original release of this Service Bulletin dated May 4,
2009 need take no further action.
2. EFFECTIVITY
Cirrus Design SR22 Serials 3003, 3310, 3326, 3403 thru 3424, 3463, and 3499 w/ FIKI ice protection system.
3. APPROVAL
FAA approval has been obtained on all technical data in this Service Bulletin that affects type design.
4. PURPOSE
Cirrus Design has obtained FAA approval to alter the TKS Anti-Ice System for the affected aircraft to operate
under Flight Into Known Icing (FIKI) conditions.
To allow flight into icing conditions as defined by Title 14 of the Code of Federal Regulations (CFR) Part 25,
Appendix C - Envelopes for Continuous Maximum and Intermittent Maximum Icing, this Service Bulletin
provides the following:
• Removal of placard restricting aircraft operation in FIKI conditions
• Insertion of Airplane Flight Manual Supplement (AFMS) into the Pilot’s Operating Handbook (POH)
• Installation of updated MFD checklists
• Serials 3003, 3310, 3326, 3403 thru 3407, 3416, 3417, 3419, 3420, 3463, and 3499: Purge/flow tests
and pump replacement (as required)
5. DESCRIPTION
This Service Bulletin contains instructions for placard removal, insertion of AFMS into POH, installation of
updated MFD checklists, and purge/flow tests and pump replacement (as required for identified aircraft).
6. WARRANTY INFORMATION
For aircraft under warranty at the issue date of this Service Bulletin, Cirrus Design will cover all parts and
labor costs for this Service Bulletin if the work is accomplished within the Compliance time period and the
work is performed at an authorized Cirrus Design Service Center.
SNS SUBJECT: 30-00 ICE AND RAIN PROTECTION - Alteration of TKS Anti-Ice System for FIKI Conditions
Issued: May 4, 2009
Revised: November 23, 2009
C I R R U S S E R V I C E B U L L E T I N MOD E L S R 2 2
SB 2X-30-03 R1
Cirrus Design SR22 Serials 3003, 3310, 3326, 3403 Page 2
thru 3424, 3463, and 3499 w/ FIKI ice protection system.
EFFECTIVITY:
November 23, 2009
7. MANPOWER REQUIREMENTS
Placard Removal, AFM Insertion, and MFD Checklist Update: 0.5 man-hour.
Purge/Flow Test Procedure (-30°C to 0°C): 3.5 man-hours.
Purge/Flow Test Procedure (Above 0°C): 15.0 man-hours.
Pump Replacement: 1.0 man-hour (per pump).
8. OTHER PUBLICATIONS AFFECTED
SR22 Airplane Maintenance Manual (p/n 13773-001)
SR22 Illustrated Parts Catalog (p/n 13774-001)
SR22 Pilot’s Operating Handbook (p/n 13772-002)
9. WEIGHT AND BALANCE
N/A
10. MATERIAL INFORMATION
N/A
11. ACCOMPLISHMENT INSTRUCTIONS
A. Acquire necessary tools, equipment, and supplies.
B. Remove key from ignition.
C. Set BAT1, BAT2, and AVIONICS switches to OFF positions.
Note: Serials 3408 thru 3415, 3418 thru 3419, 3421 thru 3424: The only requirements of this
Service Bulletin are to remove the placard restricting aircraft operation in FIKI conditions,
insert AFMS into POH, and install updated MFD checklists. Do not perform the
accompanying purge and flow tests.
D. Serials 3408 thru 3415, 3418 thru 3419, 3421 thru 3424: Perform the following steps.
(1) At LH edge of bolster switch panel, peel graphic overlay indicating “FLIGHT INTO KNOWN
ICING IS PROHIBITED” from bolster panel. (See Figure 3)
(2) Solvent clean installation surface of removed graphic overlay. (Refer to AMM 20-30)
(3) Insert the AFMS into POH.
(4) Update MFD checklists.
(a) Proceed online to the following website:
http://servicecenters.cirrusdesign.com/techpubs/mfdchecklists_sr22perspective.asp
(b) Save and unzip the appropriate checklist data file to your computer:
Serials w/o Turbo: Click SR22 Prspctv FIKI Rev 0.zip (without Turbo, with FIKI).
Serials w/ Turbo: Click SR22 Prspctv FIKI Turbo Rev 0.zip (with Turbo, with FIKI).
(c) Remove SD card with old checklists from MFD card slot.
(d) Copy chklist.ace and startup_scrn.zip to SD card.
 