曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
, POST SB
2/4
AQU3I1CK8 R/AEF3E1RE9N/ACE3 H2A0ND/A B3O2OK1
PRELIMINARY PAGES
LIST OF MODIFICATIONS 30 AUG 10
A318/A319/A320/A321 FLEET
M(1) MODIFICATION Linked SB Incorp. Date Title
P3341 30 AUG 10 LANDING GEAR - WHEELS AND BRAKES - INSTALL
MESSIER
GOODRICH WHEELS AND BRAKES ON A321
, POST SB
P4647 30 AUG 10 NAVIGATION - WEATHER RADAR SYSTEM - ACTIVATE
COLLINS DUAL PREDICTIVE WINDSHEAR SYSTEM
, POST SB
P6044 30 AUG 10 ICE AND RAIN PROTECTION-WINSHIELD- RAIN
PROTECTION-INTRODUCE MODIFIED GAGE ASSY -P/N
4020W35-2
, POST SB
P5895 34-1193 36 30 AUG 10 NAVIGATION-GPWS-INTRODUCE EGPWS P/N
206-206 AND
INHIBIT AUTOMATIC DEACTIVATION ENHANCED FUNCTIONS
, POST SB
P6952 34-1245 03 30 AUG 10 NAVIGATION-ADIRS-INSTALL LITTON ADIRU
4 MCU
STANDARD 0314 (A318 COEFF CFM ADDED)
, POST SB
P5706 31-1197 00
31-1257 01
30 AUG 10 INDICATING RECORDING SYSTEM-FWC- INTRODUCE FWC
STANDARD H2/E3P
, POST SB
P5071 30 AUG 10 ICE AND RAIN PROTECTION-WINSHIELD RAIN
PROTECTION-ACTIVATION OF RAIN REPELLENT SYS.(FLUID
COMPATIBLE WITH OZONE RULES)
, POST SB
P4319 22-1058 46 30 AUG 10 AUTO FLIGHT - FCU - DEFINE FLIGHT
DIRECTOR
ENGAGEMENT IN CROSSED BARS AT GO AROUND
, POST SB
K5213 30 AUG 10 AIR CONDITIONING-PACK TEMPERATURE
CTRLINTRODUCE
MODIFIED PACK TEMPERATURE CONTROLLER
, POST SB
P0091 30 AUG 10 OXYGEN - FLIGHT CREW SYSTEM - INSTALL A 77.1
CU/FT
BOTTLE IN COMPOSITE MATERIAL -
, POST SB
P8799 34-1352 01 30 AUG 10 NAVIGATION- GPWS - USE LATERAL GPS
POSITION WITH
AUTOMATIC DESELECTION
, POST SB
K1806 30 AUG 10 ELECTRICAL POWER-AC/DC ESSENTIAL POWER
DISTRIBUTION-PROVIDE PROVISIONS FOR ETOPS-
, POST SB
K6156 30 AUG 10 AIR CONDITIONING-PACK TEMP.CTRL INTRODUCE
MODIFIED PACK TEMP. CTRL P/N 759D0000-02
, POST SB
P7062 30 AUG 10 OXYGEN - CREW OXYGEN - INSTALL ALTERNATIVE
115CU
FT FLIGHT CREW OXYGEN CYLINDER COMPOSITE SCOTT
P/N 897940-15
, POST SB
P4576 30 AUG 10 LANDING GEAR-ALTERNATE BRAKING- INTRODUCE
MODIFIED ALTERNATE BRAKING SYSTEM
, POST SB
P7455 30 AUG 10 ELECTRICAL POWER-GENERAL-CHANGE IFE POWER
SUPPLY BUSBARS INTO SHEDDABLE BUSBARS 220XP AND
212PP
, POST SB
J0006 30 AUG 10 FUEL- INSTALL A CENTRE TANK SYSTEM-
, POST SB
P4121 30 AUG 10 EXHAUST-THRUST REVERSER CONTROL AND
INDICATING-ACTIVATE ADDITIONAL THRUST REVERSER
LOCK CONTROL
, POST SB
P9107 31-1267 03
31-1300 02
30 AUG 10 INDICATING/RECORDING SYSTEMS - FLIGHT WARNING
COMPUTER (FWC) - INSTALL FWC STANDARD H2F3
, POST SB
P7410 30 AUG 10 CERTIFICATION DOCUMENTS-GENERAL- MANAGE
A321-213
TYPE DESIGN
, POST SB
3/4
AQU3I1CK8 R/AEF3E1RE9N/ACE3 H2A0ND/A B3O2OK1
PRELIMINARY PAGES
LIST OF MODIFICATIONS 30 AUG 10
A318/A319/A320/A321 FLEET
M(1) MODIFICATION Linked SB Incorp. Date Title
P7278 30 AUG 10 INDICATING/RECORDING SYSTEM-EIS2- INSTALL
MODIFIED
EIS2 SOFTWARE
, POST SB
P6578 30 AUG 10 INDICATING RECORDING SYSTEMS- EIS-INSTALL DMC,
DU
AND DISKETTES FOR EIS2
, POST SB
P9652 30 AUG 10 AUTO FLIGHT - FLIGHT MANAGEMENT AND GUIDANCE
COMPUTER (FMGC) - INSTALL FMS2 THALES S4 (REV2+)
STD ON CFM A/C
, POST SB
K9234 23-1376 03 30 AUG 10 EQUIPMENT/FURNISHINGS-MISC.
EMERGENCY
EQUIPMENT-INSTALL ELT (406AF) WITH RCP IN COCKPIT ON
ENH. PROV. - ELTA
, POST SB
K4457 49-1055 18 30 AUG 10 A.P.U.-POWER PLANT-INTRODUCE ALLIED
SIGNAL APU
131-9(A)
, POST SB
K10516 49-1075 01 30 AUG 10 AIRBORNE AUXILIARY POWER - CONTROL
AND
MONITORING - INTRODUCE HONEWELL VECB WITH
SOFTWARE -04
, POST SB
K8400 30 AUG 10 COMMUNICATIONS-CIDS-INTRODUCE ENHANCED CIDS
(A318 VERSION) AND RELATED SYSTEMS ON SINGLE AISLE
FAMILY
, POST SB
J1334 30 AUG 10 LANDING GEAR-MLG-LGCIU-INTRODUCTION OF
STANDARD
UNIT P/N A4C
, POST SB
K7790 25-1287 05
25-1305 06
30 AUG 10 DOORS-PASSENGER COMPARTMENT FIXED INTERIOR
DOORS-INSTALL ELECTRICAL COCKPIT DOOR RELEASE
SYSTEM
, POST SB
P4230 30 AUG 10 POWER PLANT-GENERAL-INTRODUCE CFM56-5B/P
, POST SB
P9873 30 AUG 10 POWER PLANT - GENERAL - INTRODUCE CFM56-5BX/3
ENGINE (SAC) "TECH INSERTION PROGRAM"
, POST SB
P1970 30 AUG 10 COMMUNICATIONS - INSTALL HF1 FOR EROPS
, POST SB
K10494 30 AUG 10 AIRBORNE AUXILIARY POWER - GENERAL - INSTALL
APIC
APS3200 APU AS STANDARD (REPLACES HONEYWELL
GTCP36-300)
, POST SB
K10009 30 AUG 10 EQUIPMENT/FURNISHINGS - CURTAINS AND
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
A318/A319/A320/A321 QRH QUICK REFERENCE HAND BOOK 快速检查单(76)