曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
CUTOFF
13. BATT Switch - - - - - - - - - - - - - - - - - - - OFF
14. STBY INST Switch - - - - - - VERIFY AMBER
LIGHT ON; THEN OFF
15. Gust Lock - - - - - - - - - - - - - - - - - - INSTALL
16. Rudder Gust Lock- - - - - - - - - - - - - - - LOCK
(unless airplane will be towed)
17. Engine Oil Level - - - - - - - - - - - - - - -CHECK
(10 minutes after shutdown)
QUICK TURN AROUND
1. Exterior Inspection - - - - - - - - - -COMPLETE
2. Circuit Breakers - - - - - - - - - - - - - - - - - - - IN
3. L/R GEN Switches - - - - GEN (OFF if ground
power is to be used for start)
4. STBY INST Switch - - - - - - - - - -BATT TEST
(5 seconds) then STBY INST
5. Ground Power Unit (if desired) CONNECTED
6. BATT Switch - - - - - - - - - - - - - - - - - - BATT
7. PARKING BRAKE- - - - - - - - - - - - - - - - SET
8. AVN PWR Switch - - - - - - - - - - - - - - - - - ON
9. ATIS/Clearance - - - - - - - - - AS REQUIRED
10. Rotary TEST Switch - WARNING SYSTEMS
CHECK
11. Fuel Quantity and Balance- - - - - - - -CHECK
12. Pilot, Passenger, Cargo and
Fuel Weights - - - - - - - - - - - - - - - - - ENTER
13. Avionics Flight Plan (if desired) - - - - ENTER
14. AVN POWER Switch- - - - - - - OFF (if ground
power is not connected)
15. Wing/Stab Deice System (if required) CHECK
a. Pitot-Static Switch - - - - -RESET STALL
WARN then OFF
16. LANDING GEAR Handle - - - DOWN; THREE
GREEN LIGHTS/NO RED LIGHTS
17. OXYGEN SUPPLY Handle - - - -PUSHED IN
18. All other switches - - - - - - - - - OFF or NORM
19. THROTTLES - - - - - - - - - - - - - - - - CUTOFF
20. Refer to Normal Procedures, BEFORE
STARTING ENGINES
60 AA 510CLNP-07
Configuration
MODEL 510 QUICK REFERENCE CHECKLIST
COCKPIT PREPARATION
1. BATTERY DISCONNECT Switch - - - NORM/
COVER DOWN
2. INTERIOR DISCONNECT Switch- - - -NORM
3. Circuit Breakers - - - - - - - - - - - - - - - - - - - IN
4. STBY INST Switch BATT TEST (5 seconds);
GREEN LIGHT ON
5. STBY INST Switch - - - - - - - - - -STBY INST;
AMBER LIGHT ON
6. If Ground Power Unit is connected (for battery
power only, skip to Step 7):
a. BATT Switch - - - - - - - - - - - - - - - - - ON
b. AVN PWR Switch - - - - - - - - - - - - - - ON
c. BATTERY VOLTAGE - - - - CHECK 28V
d. COCKPIT/CABIN FAN Knobs - - - - - AS
DESIRED
e. AIR COND Switch - - - - - -AS DESIRED
7. Cockpit Switches and Controls - - - - - - - SET
8. BATT Switch- - - - - - - - - - - - - - - - - - - EMER
9. DISPLAY BACKUP Button (pilot audio panel)-
PRESS; CHECK POWER TO EMERGENCY
BUS ITEMS; PRESS AGAIN
10. BATT Switch- - - - - - - - - - - - - - - - - - - BATT
11. STBY INST Amber Light - - - - - - - - - - - OFF
12. PARKING BRAKE- - - - - - - - - - - - - - - - SET
13. LANDING GEAR Position Lights - - - THREE
GREEN LIGHTS / NO RED LIGHT
14. Cockpit Lighting - - - - - - - - - AS REQUIRED
15. AVN PWR Switch - - - - - - - - - - - - - - - - - ON
16. Database/Chart Currency - - - - - - - -CHECK
17. Rotary TEST Switch - WARNING SYSTEMS
CHECK
18. Oxygen System - - - - - - - - - - - - - - -CHECK
19. Fuel Quantity and Balance- - - - - - - -CHECK
20. Pilot, Passenger, Cargo, and Fuel Weights - -
ENTER (MFD AUX-WEIGHT PLANNING Page)
21. ATIS/Clearance - - - - - - - - - AS REQUIRED
22. Avionics Flight Plan (if desired)- - - - - ENTER
23. AVN PWR Switch - - - - - - ON (for GPU start)
OFF (for battery start)
24. Wing/Stab Deice System (if required) CHECK
DELAY BEFORE FLIGHT WITHOUT GPU
1. STBY INST Switch - - - - - - - - - - - - - - - OFF
2. BATT Switch- - - - - - - - - - - - - - - - - - - - OFF
BEFORE STARTING ENGINES
1. If delayed before flight without GPU:
a. STBY INST Switch - - - - - - - STBY INST
b. BATT Switch - - - - - - - - - - - - - - - BATT
2. Preflight Inspection - - - - - - - - - COMPLETE
3. Wheel Chocks - - - - - - - - - - - - - REMOVED
4. Cabin Door- - - - - - - - - - - - - - - - - -CLOSED
5. Passenger Briefing - - - - - - - - - COMPLETE
6. Seats and Seat Belts ADJUST and SECURE
7. EXTERNAL LIGHTING Switches - - - - - - AS
REQUIRED
8. AIR COND Switch- - - - - - - - - - - - - - - - OFF
9. COCKPIT/CABIN FAN Knobs - - - - - - - OFF
10. EICAS - - - - - - - - - - - - - - - - - - - - - -CHECK
11. BATTERY VOLTAGE - - - - - - - - - - -CHECK
STARTING ENGINES
1. ENGINE START Button - - - - - - - - - - PRESS
MOMENTARILY
2. THROTTLE - - - - - - - - - - - - - - - - - - - - IDLE
3. Engine Instruments - - - - - - - - - - - MONITOR
4. Engine Instruments - - - - - CHECK NORMAL
(Battery Current less than 100 Amps)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
Citation Mustang checklist NORMAL PROCEDURES(17)